Client: Steve Vik International
Value: £20.5k

The requirement

Our client has taken on a new office space due to expansion needed all new office furniture and some glass partitioning.  The customer wanted to provide some separation from the call centre staff, accounts staff and the director.  The new office has plenty of space and lots of natural light so the customer wanted glass partitioning to give separation without losing the open plan feel.

The customer wanted all new desks with screens, chairs and storage which were modern and flexible allowing them to add staff over the next few months.

Our solution

We drew the office using CAD software which enabled us to draw the existing beams in the ceiling and use these as the base layout for the new glass partitions. The beam positions means there was 2x different sized offices and 1x small triangle office.

 

The larger office gave plenty of space for 4x desks to be used as a call centre while the smaller office would only fit 2x desks for the accounts team. The small triangular office works quite well as a directors office with a large L-shaped desk looking out over the office. The main open office only had 2x desks installed but has plenty of space for future expansion

Quick installation

One of the things we love about glass partitioning is how quick they are to fit, this minimizes any disruption to the customer.

This glass partition was completed over 3x visits:

  • The first visit was to install the tracks and confirm the final position of the door. At this stage all final measurements are taken for the glass to be manufactured to fit perfectly. This visit usually only takes a couple of hours.
  • The second visit is usually around a week later to install the glass. This visit also only takes a couple of hours.
  • The third and final visit is a couple of days later to fit the manifestations onto the glass. The bespoke manifestation used a frosted band fir privacy with the CMD recruitment logo cut out which is a really smart way of using the negative space and we think its very eye-catching. Another great example of bespoke branded manifestations can be found on this project in Swindon.

Office Furniture

The customer went for a modern/industrial style office furniture.  They are grey oak desks and pedestals with a black cantilever frame with integrated cable management. The desks looked great with plain black screens and a modern black operator chair with a contrasting white plastic shell and striped mesh back.

All furniture comes in a huge range of colours and fabrics, however items like these are kept in stock and can be delivered and installed in around 5 days.

Do you want office furniture or glass partitioning?

Please give us a call or contact us and we can help with any aspect of interior office fit out, along with space planning and office furniture.

01380 73 88 44

Categories
All Project Categories Design Office Furniture Partitioning

Social Spaces in Bradford On Avon

Client: Steve Vik International
Value: £19k

The requirement

Our client has taken on a new office space due to expansion and will be putting a team of 12 into the new office space. The new office was previously used as a café/social space and has plenty of space.  The customer wanted to divide of areas for eating, informal meetings and storage without putting in solid walls.

Our solution

We drew the office using CAD software which enabled us to provide a few layout options. The 12 new desk positions were nice and simple down one side in front of the windows. The social spaces had more options and layouts to get this right for the customer. With the canteen and social spaces we provided options using meeting pods and soft seating along with open timber room dividers. The timber dividers would provide a visual separation whilst keeping it light and open. We designed the timber screens to have shelving which adds interest and space to put plants. Plants are always a great addition to the office and adding greenery and interest.

Building the screens

The timber screens were built on the floor before being stood up and fixed in place. The screens were fixed using Dowell joints to ensure the screws aren’t visible. Sections of beading were installed along the bottom of the shelves to prevent plant pots from sliding off. The timber screens were then finished with 2 layers of hardwearing stained varnish to make the colour match the office.

Finishing touches

The vibrant coloured swivel chairs are made to order and add a fantastic pop of colour to the new informal meeting area. The customer added in their own dining furniture and a range of plants to make this area super fun and comfortable.

Do you want a social working environment or have a canteen to upgrade?

Please give us a call or go to the contact us page and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
All Project Categories Design Office Furniture Office Refurbishments

Office Design and Refurbishment

Client: Ari Fleet
Value: £92k

An Office Design and Refurbishment Project for Ari Fleet in Chippenham was not initially considered when we visited to discuss some sound problems in their offices. Their concern was that they knew something had to be done, and had prices for furniture and had an idea on what  they liked for carpets, but were not sure how the project could be all tied together, with a total budget, with a list of things that they wanted doing.

The other major problem was that the office space was occupied, so the ground floor area would need to have many people moved around in various phases. So Cre8tive were tasked to pull the whole project together.

The majority of the ground floor space consisted of around 100+ desks. We also had to assess what future capacity we could accommodate due to the future growth plans of the business. The desk layout was important to show this, so we carried some designs and plans.

We felt that an area was needed to encourage staff to meet outside the tea room in a less formal environment and so we allocated some space for this. Our original idea was to have a curved breakfast bar in the bottom corner of the building, joining the two sections of office space together. At this stage the customer thought this a bit too adventurous and they wanted to keep their meeting rooms.

Design and Planning work

Always the first task in a Design and Refurbishment project is to get the space working correctly without focusing at an early point on the product. Once the basic desk plans were agreed we then looked to examine different suppliers, and we selected a couple from Frem and another supplier. We then set up both types of desks from different suppliers in an office for the staff to try out. The staff actually selected the cheaper version which was a surprise. However the staff voted on the selection and Ari Fleet management went with their selection.

We then asked for the corporate colours, we also provided some colour options and carpet choices to show how all of the colours could go together. We were then able to provide budget costs for all of the options. The overall costs including decoration, and the choice of the cheaper furniture met their budget.

We then decided to split the work into three phases so the staff could be moved around the other office space available upstairs, giving time for Ari Fleets’ IT people to disconnect and reconnect desks in between the phases.

Initial Photographs

As you can see from the photographs below the existing screens were red, and the desks were 120 degree. Many years ago this design was quite innovative, but time moves on, particularly there is not the requirement for desk space now with flat screen technology. There is also much less paperwork on desks now, with everything being more electronic.

The carpet was also quite worn in places, although a decent quality when fitted the design is no longer made, so hard to patch and make good, so needed to be replaced. Naturally the carpet wears under desk positions with peoples feet and corridor routes, not much can be done about this.

Phase one side of the building

Quite a bit of work was required to prepare the area as you can see from the photographs. A large gang of furniture fitters was required to install of the furniture in a day allowing the customer time to carry out the wiring and gradually move people over from the other areas. Once we finished our work, we planned in 2 weeks to give the customer time to organise staff before we tackled the next phase. In fact the following area ended up almost running on directly from the previous phase, so much quicker than we thought.

Phase two side of the building

Phase three Breakout area

Completed photographs

Office Design and Refurbishment Projects

We really enjoyed this project. The o-operation that Ari management got from the staff was brilliant as they involved the staff in the process all along. This is always important on larger projects where you are affecting the way people work, if you can involve the staff then managing any change is much easier.

What was really rewarding is the comments from the customer at the end of the video clip. The refurbishment has changed the way the staff work for the better, there is more involvement and closer team working by using the new break out area.

If you would like any help on any project like this please give us a call on 01380 73 88 44 or email us at [email protected]

office design and refurbishment

 

office design and refurbishment

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Projects Storage Walls Visuals

Office Design and Fit Out in Swindon

Client: One Technologies
Value: £260k

We carried out an Office design and fit out fit out project for One Technologies Ltd in Swindon,Wiltshire. The project included creating ideas for the design, detail specification and documents, planning and then organising the work which was completed on time within budget.

The customer is an American company that wanted to set up and office in the UK. They had a breakfast bar in their office in Dallas, we tried to replicate the way they work in the US so part of their culture of how they work comes across into the UK. The customer is a web based company and the new office will be receiving inbound calls so is basically a call center. The image of a phone box in the reception is intended to reflect this and is one reason why there is a  concentration of desks in space. The digital image that is printed on heavy textured wall covering. Desk footprint was important in getting the right numbers in, and we have designed this so they can increase the numbers easily, all of the future space planning has been done. You will see the grey wallpaper in the office is very textured to give some personality to the paper and help with sound performance.

The activities included Office Design, Project Management, CDM regulations, Building Regulations, contracts, stripping out work, demountable glass partitioning, decorations, design of a breakfast bar, supply and fit of all office furniture, air conditioning new and changes to existing, ventilation changes, lighting, electrical work, data cabling, supply and fitting of the communications cabinet, cctv, access control, audio visual equipment and connection, storage wall and flooring changes. We also supplied all of the office furniture, screens, cupboards, plants, graphics, chairs and monitor arms.

Preparation work.

Much of the initial time on the project was spent exploring different layouts and seeing how the space could work. Care was taken in seeing how the customer wanted to use the space to have an area where people could relax and have teas and coffees.

Design Visuals.

We have covered elsewhere in this website our view on visuals. Please click this link for more explanation as to the difference between drawing work, space planning and 3d visuals. As a large proportion of the cost of the project focused around the breakfast bar we felt creating visuals was really important. The breakfast bar being an essential part of the office design. The film taken of this project reinforces how much the finished build reflects the initial visuals we produced for the project. Although they are in the film clip, they can be seen below:

Specifications, contract and planning.

The next step was to provide much more detail in the the specifications in the form of written documents. We had a commercial contract drawn up, as well as produced a full build specification document detailing every aspect of the build. Due to the amounts of money involved £250k +, we produced a project plan which showed the phases of when payments were due to be made depending on when various parts of the project were delivered. The final document was a detailed Gantt chart showing project timelines, dates, slack periods, completion dates and contingencies. Also built in were times required for the American IT team to visit and have all of the computer equipment installed and configured.

Build Photographs.

As you can see from the photographs there was quite a bit to organise, in particular we had to follow the progress to a programme, as well as maintaining dates that had to fit in with the American IT team visiting the UK to install the server the programme had to be met for the financial reasons in order to maintain a steady flow of payments coming to us from the USA. The main office design and fit out project for us was only one small part in order to get the office up and working. The customers IT people only had 3 days to install all of the equipment, so all of the infrastructure cabling, power, air conditioning, cabinets and of course all of the security access controls and cameras had to be fully working before they came over to visit. They were bringing with them a special server built by Dell to handle the call volumes anticipated in the office and the server itself cost 7 figures.

Final photographs finished office.

We are very please with the final office design and fit out. If you have not seen the video in the first part of this page then you can also see it here by here by clicking this text..

Moving / expanding or have problems with your existing office space?

Many offices have problems with sound, problems with fitting enough people in, and may look dated and need reworking which is where we can help. From an initial brief as to what the problems are to the final completed office we can carry out everything that you need inside an office. In the project above we used demountable partitioning but using a special type of glass to enhance sound performance. The system was also a propriety demountable partition system called Komfort Polar. The glass wall was double glazed, with seamless glass joints for a smooth simple look.

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Projects

Office Refurbishments in Bath

Client: Regency Laundry
Value: £28k

Cre8tive have carried out many office refurbishments over the years and all need to have some design and drawing work done initially and is the most important aspect of a project that needs to be  carried out in order to carry out a project properly. The existing office space had small narrow corridors, a dated partitions system and dark green colours making the space very dark.

We redesigned the office space and used beam system furniture to get computer cables off the floor. We also created a tea point in a cupboard and added some features in the carpet for some added interest in the design. All of the walls had to be redecorated. The refurbishment project consisted of Komfort Kameo 75mm demountable partition system, Gaskell carpet tiles, Armstrong suspended ceiling and Sebastien Indulgence furniture.

Included:

  • Design and drawing work
  • Stripping out of existing
  • Demountable Partitioning
  • Electrical work
  • Air conditioning
  • Flooring
  • Kitchen / tea point
  • Office Furniture

Drawing and Design Work

Working out what the customer wanted meant we had to drawer what they had and come up with several layouts to explore how the office would work for them.

Office Refurbishment Construction Images

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure what to do?

  1. Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.01380 73 88 44
Categories
Air Conditioning All Project Categories Design Office Refurbishments Partitioning Suspended Ceilings

Complete Office Design and Refurbishment

Client: Thales Optronics
Value: £55k

Cre8tive Interiors were ask to look at the complete office design and refurbishment for Thales Optronics in Taunton, to convert an existing factory area into a new reception area. Initial work required the removal of a metal skinned demountable system, ceilings and lighting, along with stripping out and replacing the entrance doors with new glass doors.

The lighting chosen was LG3 direct / indirect fittings which is the recommend lighting systems for modern offices. The partitions included silicon jointed glass called Komfort Polar, joining into Komfort Kameo 75mm system which offers a soft radius profile and joins neatly with the Polar silicon jointed system. The doors are disable access width to conform to the DDA regulations.

Existing Space

Thales did not use this building and wanted to create more of a main reception for the site. The building inside was very factory looking, in that it had metal partitions. Fine for a laboratory environment, not very nice for offices. The lighting was also pretty bad with old lino, the whole area needed replacing.

Drawing and Design work

Construction work

Final Photographs

Design and Refurbishment Work

Often with these projects the hard part is knowing where to start. The customer knows it is not right and may have seen other areas that they like. Translating that into a cost can be quite difficult, so what we do at Cre8tive is to listen and then try and interpret what the customer wants. We go through certain steps and doing the drawing work is one of them.

If you are struggling to come up with something, please do not hesitate to give us a call 01380 73 88 44 or email us on [email protected]

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Suspended Ceilings

Office Refurbishment in Bristol

Client: Smurfit Kappa
Value: £65k

Office Design and Refurbishment in Bristol

Our client wanted a complete redesign refurbishment of the existing office space. The first task was to come up with some ideas and some colour schemes, the director wanted an adventurous new scheme, so we focused upon creating a more spacious effect through introducing new concepts of Lighting, Suspended Ceiling, Partitioning, new Air Conditioning systems, Flooring and Furniture in order to create a more relaxed office environment that mixes bold contemporary colour and natural materials.

Design and Drawing work

In working out what needs to be done, we need to know what is there. A detailed drawing showing positions of electrics and the walls was produced. The new layout required a few designs, and in particular the Director wanted to have a meeting end on his new desk, so we had to design a desk and get it made particularly for him.

Colour scheme / Design

As this area was a completely separate area from the upstairs directors suite, we thought that the whole scheme could be different. The room was completely separate from the rest of the building, so when you walked in, there was a different feel which was modern, had a blend of the traditional timber partitions, along with some stripy carpet, and the middle solid carpet was a very high quality cut pile carpet which felt soft and luxurious underfoot. One of the main requirements was that the Managing Director wanted a meeting end on his desk and it was not possible to get one to fit from standard product ranges. We therefore had to get one made..

Existing space

As you can see from the photographs the whole area needed completely stripping out and replacing.

Stripping out and building photographs

I always like this phase as the office transforms, from a very dull space to something new. We do get an immense level of satisfaction in carrying out office refurbishment projects for this reason.

Final photographs

As you can see from the final photographs, Cre8tive were successful in carrying out a complete redesign and office refurbishment of the customers existing space.

Why Demountable Office Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
All Project Categories Design Office Refurbishments

Refurbishment Projects in Bristol- Innovations Centre

Client: Smurfit Kappa
Value: £118k

Office Refurbishment Projects

We have carried out several refurbishment projects for Smurfit Kappa over the years and the customer had every confidence that we could deliver. The project had to be run under the Construction Design and Management Regulations (CDM) due to the time on site, and the number of fixers on site as well. Please click the link to go the page which explains more about CDM.

The office refurbishment project was made more complicated as the main staircase had to made available whilst the work was carried out, so planning and carrying out the appropriate risk assessments was important.

Office Refurbishment Scope of Work

The work included:

  • Initial project brief
  • Development of ideas with the customer
  • Drawings, designs, 3d visuals
  • Costing
  • Liaising with on-site Health and Safety advisors, production of Health and Safety Plan.
  • Running the project under CDM
  • Completion on time within budget

Supply and fit of: stripping out, electrical work, flooring, lighting design, office furniture, design of colours and specification of finishes, air conditioning, decoration and construction of a curved presentation wall and fitting the customers own artwork.

Initial photographs of existing space

This was essential to try and work out what we were dealing with. The constraints as well had to be considered which mainly revolved around agreeing access times to get materials up and down the main staircase. First task is always to take loads of photos, measurement, then to go away and think about it.

Initial Designs

The first step in any office refurbishment projects that needs design is to work out the basic space plan first, once this was done we produced a series of the 3d visuals to help the client understand what the space may look like, and use this tool to further refine and ensure that the customer will get exactly what they want.

Detailed drawings

Once the design was approved the next task was to detail up the drawings to ensure that we produced exactly what the customer wanted. The table for the downstairs meeting room was made to a Smurfit Kappa specification and design. We had to squeeze it in to the space however which was a bit difficult.

Construction Photographs.

One of the tricky things to do was to actually get to the height of the roof using mobile towers. The insulation had to be tacked in place so it did not slip down the roof, everything boarded, tape and jointed then painted, all working 5 meters off the floor.

There are so many awkward angles, it is hard to show with photographs the geometry of everything.

Final Photographs

The final result was a mixture between the original design that we did and adjustments made by the client. The actual box wall itself was made by the customer as this is what they do, construct things in cardboard. We had to give them the curve and they did the rest. Overall the customer was very happy with the result

Similar Project?

Although it is very unlikely that we will ever come across a project exactly the same, the same basic principles in what we do are carried through all projects.

If you are stuck for ideas but know that something needs to be done, please give us a call on 01380 73 88 44 or email us at [email protected]