We can carry out Dilapidation work for customers when the customer is required to carry out work by a landlord if they are moving premises, please see our post for more description about what it means by clicking this link.

We carried out quite a major change visually to a worn out factory that looked tired and needed sprucing up. The main elements were a new factory floor, decoration, refurbishment of the offices, and to tidy up the existing mezzanine floor. The existing fire protection on the steel work was not adequate and not fitted correctly, so rather than just paint it, we decided to completely strip it off and install a new fire rated suspended ceiling and a new column encasement system. A quick lick of paint would not have satisfied the fire protection requirements so we decide to do this properly and install all of the correct materials.

Existing Warehouse

The customer has been in the existing building for many years and the unit the occupy is part of the original railway buildings in Swindon, so is probably around 100 years old. As you can see from the photos the the building was quite dilapidated, and this is often referred to as dilapidation work.

Old mezzanine floor

Electrics need sorting!

Wider view

Lots of wires need sorting

Some wires not connected!

Poor fire protection

Poor walls

Toilet to be reduced in size

Toilet block to sort

Kitchen to come out

What was most alarming was the existing fire protection had been carried out by people who clearly did not know what they were doing and there were gaps everywhere, there was no way that the mezzanine floor had adequate protection, so even though the customer just wanted a very basic patch and mend, we took the decision to completely replace everything and do the whole job properly.

Although the photographs do not show it, there was quite a bit of work to completely redecorate the offices at the front of the unit. This included stripping out the kitchen, toilets, stairs, repainting the doors, walls, ceilings and skirting boards.

Construction work

The other constraint that we had is the whole job had to be completed in 3 weeks as a new machine was due to arrive in the unit. The reason why the toilet block had to be halved, was that the new machine was 26 meters long and so it would not quite fit.

Toilet door moved back

Poor state of mezzanine

Steel work being exposed

Exteriors walls bad

Plasterboard stripped out

More stripped

Bottom office demolished

New fire line board bulkhead

Starting wall treatment

Toilet halved

Walls nearly done

Walls nearly done

Our van

Completed Photographs.

We were very pleased with the final results as there was such a difference between what was, and what we achieved in the end. The client was also very pleased with the work as we completed it on time and within budget.

New tea point downstairs

New floor

Office decorated

New ceiling

Toilets redecorated

Our van

Internal doors painted

Finished floor

Fire exit door

New equipment just coming in

View from other direction

Finishing things properly

On top of mezzanine

New fire rated ceiling

Dilapidation Work

As you can see from the photographs, the work is general office refurbishment, and covers all of the things that we would carry out for office interiors. If you have any requirements for dilapidation work that is relevant to offices or warehouses then we would be very pleased to hear from you, as we find this type of work very rewarding, and that is not from a monetary view but seeing the difference between old and new.