Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Projects Storage Walls Visuals

Office Design and Fit Out in Swindon

Client: One Technologies
Value: £260k

We carried out an Office design and fit out fit out project for One Technologies Ltd in Swindon,Wiltshire. The project included creating ideas for the design, detail specification and documents, planning and then organising the work which was completed on time within budget.

The customer is an American company that wanted to set up and office in the UK. They had a breakfast bar in their office in Dallas, we tried to replicate the way they work in the US so part of their culture of how they work comes across into the UK. The customer is a web based company and the new office will be receiving inbound calls so is basically a call center. The image of a phone box in the reception is intended to reflect this and is one reason why there is a  concentration of desks in space. The digital image that is printed on heavy textured wall covering. Desk footprint was important in getting the right numbers in, and we have designed this so they can increase the numbers easily, all of the future space planning has been done. You will see the grey wallpaper in the office is very textured to give some personality to the paper and help with sound performance.

The activities included Office Design, Project Management, CDM regulations, Building Regulations, contracts, stripping out work, demountable glass partitioning, decorations, design of a breakfast bar, supply and fit of all office furniture, air conditioning new and changes to existing, ventilation changes, lighting, electrical work, data cabling, supply and fitting of the communications cabinet, cctv, access control, audio visual equipment and connection, storage wall and flooring changes. We also supplied all of the office furniture, screens, cupboards, plants, graphics, chairs and monitor arms.

Preparation work.

Much of the initial time on the project was spent exploring different layouts and seeing how the space could work. Care was taken in seeing how the customer wanted to use the space to have an area where people could relax and have teas and coffees.

Design Visuals.

We have covered elsewhere in this website our view on visuals. Please click this link for more explanation as to the difference between drawing work, space planning and 3d visuals. As a large proportion of the cost of the project focused around the breakfast bar we felt creating visuals was really important. The breakfast bar being an essential part of the office design. The film taken of this project reinforces how much the finished build reflects the initial visuals we produced for the project. Although they are in the film clip, they can be seen below:

Specifications, contract and planning.

The next step was to provide much more detail in the the specifications in the form of written documents. We had a commercial contract drawn up, as well as produced a full build specification document detailing every aspect of the build. Due to the amounts of money involved £250k +, we produced a project plan which showed the phases of when payments were due to be made depending on when various parts of the project were delivered. The final document was a detailed Gantt chart showing project timelines, dates, slack periods, completion dates and contingencies. Also built in were times required for the American IT team to visit and have all of the computer equipment installed and configured.

Build Photographs.

As you can see from the photographs there was quite a bit to organise, in particular we had to follow the progress to a programme, as well as maintaining dates that had to fit in with the American IT team visiting the UK to install the server the programme had to be met for the financial reasons in order to maintain a steady flow of payments coming to us from the USA. The main office design and fit out project for us was only one small part in order to get the office up and working. The customers IT people only had 3 days to install all of the equipment, so all of the infrastructure cabling, power, air conditioning, cabinets and of course all of the security access controls and cameras had to be fully working before they came over to visit. They were bringing with them a special server built by Dell to handle the call volumes anticipated in the office and the server itself cost 7 figures.

Final photographs finished office.

We are very please with the final office design and fit out. If you have not seen the video in the first part of this page then you can also see it here by here by clicking this text..

Moving / expanding or have problems with your existing office space?

Many offices have problems with sound, problems with fitting enough people in, and may look dated and need reworking which is where we can help. From an initial brief as to what the problems are to the final completed office we can carry out everything that you need inside an office. In the project above we used demountable partitioning but using a special type of glass to enhance sound performance. The system was also a propriety demountable partition system called Komfort Polar. The glass wall was double glazed, with seamless glass joints for a smooth simple look.

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
Partitioning Projects

Demountable Partitioning in Chippenham

Client: Sat 7 Chippenham
Value: £7.6k

Sat 7 based in Chippenham contacted us recently as they wanted us to remove partitioning walls within their 2nd floor office which included large glass windows. They also wanted new demountable partitioning put up within this office space, once this was done we had to match and repair the carpet.

Construction photographs.

There are quite a few different configurations possible with demountable partitioning. The glazing can be single or double glazed. In this particular design double glazed was chosen as you get better sound insulation, and you can have integral blinds inside the glass which can be turned via a control knob to open and close the blinds.

The glass window height and width you can also vary, in this case we have tried to maximise the glass height, and have added a side window of glass for the smaller office as well.

Why Demountable Partitioning?

  1. Demountable partitioning are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Questions on Demountable Partitioning?

If you are not sure about anything we love to talk about projects and sort out problems and issues with space, please give us a call on 01380 738844

Categories
All Project Categories Office Furniture Office Refurbishments Suspended Ceilings Visuals

Office Fitting out in Trowbridge

Client: Sea Terra Trowbridge
Value: £12.5k

Office Refurbishment

This project involved the office fitting out of an existing office space in order for the company to occupy. The existing office looked quite dated, but the position of the space and the structure suited the customer well. As the office was going to be busy with lots of noise on the phone a suspended ceiling was essential, as well as providing CAT 2 lighting which is needed when working on computers.

Space Planning and design work.

The space was quite small, there was also a requirement to fit a certain number of people inside the office and so a basic space plan was required.Moving on from a basic space plan we applied some colours to the layout as well so the customer had some idea what could be done by using different carpet colours. There is a difference between basic drawing work and space planning, please click on the link for more of an explanation.

Final photographs.

Luckily the office space was empty so it made fitting the suspended ceiling much easier. The original space was just an old shop with a plasterboard ceiling and old fissured (squiggle pattern) tiles which made the space look really dated. The lighting was surface mounted tubed light fittings which are not allowed under the Visual Display Regulations, so they had to be changed anyway to CAT2 at the very least as the customer was using computers.

The project included the installation of a new suspended ceiling, new CAT 2 lighting & electrics,  new flooring, decoration and furniture. The ceiling was slightly tricky as the existing space had arches located centrally within the space.

Suspended Ceiling

Suspended ceilings are almost always used when carrying out an office refurbishment as existing ones can look tired. We have a bit more information on suspended ceilings on the following link if you would like to have a look, please click this link. The choice of the suspended ceiling is almost always price versus performance. It is possible to have a plasterboard ceiling but the problem with this type is that it is very hard to get services over the ceiling with access problems, and the hard surface of the ceiling lets the sound bounce around. The mineral fibre tiles that are generally used offer good sound absorption properties, and can easily be taken out to get to any cabling that you may wish to run over the grid system.

We also install all our ceilings with a self leveling laser to so the ceiling is completely flat. Some builders try and put ceilings in and we do often have to put them right, it is important to get the supporting wires tensioned properly as well as centering the grid system properly so it looks evenly balanced in the space.

The furniture chosen was a beam system type of furniture which allows cables to be hidden in an integral beam that joins the leg frame uprights together.

Please give us a call on 01380 73 88 44 for more information about this project or any requirement you may have.

Categories
All Project Categories Office Refurbishments Partitioning

New Office Refurbishment

Client: Office Evolution
Value: £13k

Office Refurbishment

This customer purchased an industrial unit that was fitted in a way that was not really suitable for them as they needed to use it for offices. The whole space needed an office refurbishment with most things needing to be done. Creating a professional atmosphere was important as the customer wanted to use the office as a showroom as well.

They also wanted a double door to the garage area so that this could act as a store and a suspended ceiling throughout, and to make the space light and airy we used Cat2 lighting throughout.The project included a small bit of stripping out, new kitchen, redecoration, electrical power and data, new demountable partitions, new suspended ceiling and lighting and a new carpet.

Office Refurbishment Construction Photographs

Why Demountable Partitions in an Office Refurbishment?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved we can lease.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure about what to do?

If you need help with anything and are not sure what to do, please give us a call for a chat and a visit. We are happy to carry out as much or as little as you require and can come up with solutions to any problems or queries you have about an office refurbishment project.
Please call 01380 73 88 44

Want to find out more about our customer?

Please click this link to go to their website..

Categories
Air Conditioning All Project Categories Design Office Refurbishments Partitioning Suspended Ceilings

Complete Office Design and Refurbishment

Client: Thales Optronics
Value: £55k

Cre8tive Interiors were ask to look at the complete office design and refurbishment for Thales Optronics in Taunton, to convert an existing factory area into a new reception area. Initial work required the removal of a metal skinned demountable system, ceilings and lighting, along with stripping out and replacing the entrance doors with new glass doors.

The lighting chosen was LG3 direct / indirect fittings which is the recommend lighting systems for modern offices. The partitions included silicon jointed glass called Komfort Polar, joining into Komfort Kameo 75mm system which offers a soft radius profile and joins neatly with the Polar silicon jointed system. The doors are disable access width to conform to the DDA regulations.

Existing Space

Thales did not use this building and wanted to create more of a main reception for the site. The building inside was very factory looking, in that it had metal partitions. Fine for a laboratory environment, not very nice for offices. The lighting was also pretty bad with old lino, the whole area needed replacing.

Drawing and Design work

Construction work

Final Photographs

Design and Refurbishment Work

Often with these projects the hard part is knowing where to start. The customer knows it is not right and may have seen other areas that they like. Translating that into a cost can be quite difficult, so what we do at Cre8tive is to listen and then try and interpret what the customer wants. We go through certain steps and doing the drawing work is one of them.

If you are struggling to come up with something, please do not hesitate to give us a call 01380 73 88 44 or email us on [email protected]

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Suspended Ceilings

Office Refurbishment in Bristol

Client: Smurfit Kappa
Value: £65k

Office Design and Refurbishment in Bristol

Our client wanted a complete redesign refurbishment of the existing office space. The first task was to come up with some ideas and some colour schemes, the director wanted an adventurous new scheme, so we focused upon creating a more spacious effect through introducing new concepts of Lighting, Suspended Ceiling, Partitioning, new Air Conditioning systems, Flooring and Furniture in order to create a more relaxed office environment that mixes bold contemporary colour and natural materials.

Design and Drawing work

In working out what needs to be done, we need to know what is there. A detailed drawing showing positions of electrics and the walls was produced. The new layout required a few designs, and in particular the Director wanted to have a meeting end on his new desk, so we had to design a desk and get it made particularly for him.

Colour scheme / Design

As this area was a completely separate area from the upstairs directors suite, we thought that the whole scheme could be different. The room was completely separate from the rest of the building, so when you walked in, there was a different feel which was modern, had a blend of the traditional timber partitions, along with some stripy carpet, and the middle solid carpet was a very high quality cut pile carpet which felt soft and luxurious underfoot. One of the main requirements was that the Managing Director wanted a meeting end on his desk and it was not possible to get one to fit from standard product ranges. We therefore had to get one made..

Existing space

As you can see from the photographs the whole area needed completely stripping out and replacing.

Stripping out and building photographs

I always like this phase as the office transforms, from a very dull space to something new. We do get an immense level of satisfaction in carrying out office refurbishment projects for this reason.

Final photographs

As you can see from the final photographs, Cre8tive were successful in carrying out a complete redesign and office refurbishment of the customers existing space.

Why Demountable Office Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
All Project Categories Consult Install Office Refurbishments Partitioning

Office Fit Out British Nuclear Group

Client: British Nuclear Group
Value: £99k

Cre8tive were contacted by an Office Furniture company as they were not able to deal with the office fit out side of the project for British Nuclear Group. The customer had already employed an architect to specify what was required and so it was really a case of demonstrating that we knew what we were doing and that could cost the project to meet the clients budget. This project took place on the ground floor of Mallard Court.

The project was designed by Oxford Architects who specified the partition system.

The project was a 6 week duration project which had to run under the Construction Design and Management regulations. Cre8tive Interiors acted as Principle Contractor on the project. The office fit out  for British Nuclear Group consisted of Komfort Double Glazed Polar Demountable Partition System, as well as single glazed Polar screens and Komfort Komfire 100 partitions. The project also included supplying and fitting of a kitchen from Howdens, new carpets, fitting of fire barriers in the ceiling and floor voids, and complete decoration of the workspace.

Initial design and drawing work

Initial site photographs before work

Construction Photographs

Working for the British Nuclear Group had it’s challenges. As you would expect every aspect of the work was scrutinized, we also had to have a permanent person on site all of the time which sometimes on projects like this we do not always need to have fitters doing work whilst other work is being done by others. BNG contracted their own duct work people, so they had to carry out some works when we had to be off site.

Completed Photographs

Why Demountable Partitioning?

This particular project had what we call demountable partitioning in it. Landlords insist on this type as it can be easily relocated without doing much damage to the building.

  1. Demountable partitioning is tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Need an Office Fitting out?

This particular project was driven by BNG with a design carried out by Oxford Architects. We were the contractor who completed the work. If you need any design work doing we can do this, as well as being the principle contractor for the work.

Any questions please do not hesitate to contact us on 01380 73 88 44 or email [email protected]