Client: Anthony Best Dynamics
Value: £3.5k

The requirement from our client was that they needed a glass partition built to protect staff from draughts, and also to maximise light inside the new office space. The challenge with this project was that the partition line did not fit directly under the mezzanine floor line above, and so we had to stand out the partition from the edge, and fill in lots of gaps. From the outside view from the warehouse, you could not see an issue or problem.

We use Demountable Partitioning rather than stud and plasterboard, as the systems allow window and door frames to be made quickly and easily. The partition system is made from aluminium sections which have to be cut on site, forming frames for the glass, door frames, metal stud work and plasterboard. We have a short video on our YouTube channel that demonstrated this; please click this link. In this particular design for Anthony Best Dynamics the lower panels were solid, and the customer wanted us to maximise the glass area so that the internal office had as much natural light as possible.

Existing Layout

The glass partition position had to be fixed at one end against an outside wall which was not an issue; the other end had to fix to an existing partition which had a window already installed. The line of the new glass partition would have taken the wall directly over the window, and so we moved the wall over to avoid this. However, this meant that we could not fix the top to line up with the mezzanine floor, so we built a small false extension to the mezzanine floor.

Construction

Construction took two days to complete. Once the glass partition frames and plasterboard were fitted the solid panels were decorated with a contract grade wall paper from Dixon Turner. The windows were made on site, and so the glass had to be measured and fitted later. However this meant that the room was fully usable in the meantime so the customer could continue moving furniture into place.

Completed Wall

As previously mentioned in this project post, the system was constructed from a product called Demountable Partitioning with which we have many years experience. The flexibility it offers means that the partitioning can be re-used and not discarded if a change is needed in the future.

Why Demountable Partitioning?

  1. Using Demountable Partitioning is very tax efficient as they are classed as movable items and so can be treated differently when accounting. Please click the link for more information on demountable partitioning.
  2. We can also lease Demountable Partitioning as they are movable. This spreads the costs of having the work done as Demountable Partitions can be an initial costly outlay.
  3. Leasing of Demountable Partitioning is very tax efficient and Cre8tive can provide cost illustrations. Please contact us for further information.
  4. Most landlords insist on Demountable Partitions being used for offices as it is much easier to take them out when the tenant vacates. The main benefit is that is saves a huge amount of mess and destruction that would be needed with a conventional stud and plasterboard constructed wall.

Questions on Glass Partition Walls

Please give us a call on 01380 738844 or complete our website contact form if we can help you with any of your projects, or if you have specific questions about Glass Partition Walls.