Categories
All Project Categories Office Refurbishments Suspended Ceilings

Hall Refurbishment in Chippenham

Client: Chippenham Rotary Hall
Value: £21.5k

Chippenham Rotary Club wanted a Hall Refurbishment to bring the dark and dated old hall into the 21st century and make it more appealing to those looking at hiring the space.

The first task was to survey the existing space and understand the requirements for the space.

Existing Hall Space

The existing space was very dated and there were a number of tasks  that we could easily identify that would make a big impact straight away. The dated carpets, the woodchip wallpaper and the poor lighting all needed replacing.

Our first step is to measure the space, have a meeting to discuss what the customer likes and dislikes and how the space will be used.

Next we go away and produce some plans and costs for the project. Once the basic cost is determined we can adjust the specification to suit the customers budget so we show all of the costings and juggle things around to get to a cost that everyone is happy with before we carry out any works.

Work in Progress

The Hall Refurbishment went really smoothly and every element made such a big difference.

The new suspended ceiling used a modern flat white tile which looks much cleaner than the old fissured tiles, we also cranked the ceiling to maximize the available height in the middle making the space much more light and airy.

The woodchip wallpaper was removed, all walls were re-plastered before being decorated in a neutral grey with an orange feature wall. All of the old dark wooden skirting boards and window sills were painted using good quality white gloss to compliment new lighter colour scheme.

The LED lighting with spots around the edges and LED panels in the centre fills the space with much more light and it is fully adjustable with dimmer controls for each section making it nice and easy to see the projector screen.

The new wood effect vinyl flooring looks great whilst being super hard wearing and ultra realistic with textured woodgrain and beveled planks.

The final element was to replace the double entrance doors into the hall with a modern light oak veneered door with extra large vision panels and stainless steel kick plates and pull handles.

Completed Photos

The finished hall looks clean, fresh and modern whilst also being much more practical with easy to clean flooring and much better lighting levels.

The new hall will appeal to more people running groups, training or events with such a versatile space.

Does your Hall or function room look dated?

Please give us a call or contact us and we would be more than happy to help you modernize your space and appeal to more customers.

01380 73 88 44