Office Refurbishment in Milton Keynes

Client: Edwards International
Value: £187k

Office Refurbishment

We were  invited by this customer to have a look at their existing office space as it needed an office refurbishment in Milton Keynes and the customer did not know where to start. They found us on the internet and liked our website as it showed real photos of actual projects rather than nice photo shopped images.

Out of the few that they contact we were the only ones to respond to their enquiry within a day.

When we first visited the client it was very obvious that the while area needed stripping out and starting again. What was surprising, although in reality we are not surprised, was that the existing partitions and mezzanine floor were not fire rated. We recognised the system below the mezzanine as a 50mm wide demountable partition system which has no fire rating at all. None of the exit routes out of the building were 30 minute protected and the mezzanine floor had a suspended ceiling fitted but it was not fire rated. The staff were working in a death trap. If there was any problem in the building then there would be a lot of trouble. The customer specialises in fire detection equipment, so for them to be in a building that was a potential death trap as it was not properly fire protected was nonsense.

Building Regulations

There were three different mezzanine floors installed at various times at different heights, and no paperwork to show that they had been passed Building Regulations, so from a fairly straightforward requirement to refurbish the offices there was a need to look at the whole building, design and specify it properly and get Building Regulation Approval. In the design we had to consider:

  • Fire protection of the mezzanine floors using the correct grade of suspended ceiling tile and support  column encasement
  • Correct design of protected fire exit routes throughout the building, checking of escape distances and signage
  • Full electrical design to suit.
  • New fire rated partitions where needed to meet Building Regulations
  • Supplementary fresh air systems to enclosed offices
  • Changes to air condition systems
  • Heating were needed.

CDM

There was no doubt that we were going to be on site for more than a month, and have more than 5 people on site, the whole project was quite a bit of work and so the work comes under the Construction Design and Management Regulations. The purpose of the regulations is to protect the employee and employer in making sure that a construction project is run safely. If you do not notify the Health and Safety Executive that the project is being carried out and there is a problem then directors of the company where the work is being done can go to jail.

Where do we start?

The first step is to measure everything and take lots of photos to see exactly what has been fitted. The next was to understand from the customer how they wanted to work in the space, so this included some basic functional block drawings identifying where they wanted Sales, Accounts and Technical. Once the broad locations were identified then the detail layouts were carried out identifying voice and data positions, partitioning and ceiling layouts and the work that had to be done on the mezzanine floor. Once the layouts were agreed we had to submit the plans to Building Control and get their approval which we did.

We produced many many drawings. All showing everything that was needed for each trade. Some shown below. The important document was the Building Regulations Approval document that is a legal requirement.

Existing Photographs

The first two photographs below show the immediate and obvious problem. The partitions are 50mm wide demountable and are not fire rated at all. The third photo shows the the vast storage area out the back. The rest just show the general bland and dated look of everywhere needed some tlc.

Stripping out and Construction work

We produced a plan and submitted all of the documents to the local Building Control people who assessed the drawings and arranged for some visits throughout the work. We also employed a Health and Safety Consultant who oversaw the work and kept all of the sub contractors on their toes, and they submitted the F10 to the Health and Safety Executive.

Refurbishment Projects

Categories
Air Conditioning All Project Categories Office Refurbishments

Refurbishment in Shepton Mallet

Client: Easynet Global Services
Value: £160k

Refurbishment

Cre8tive was asked to tender to carry out an office refurbishment in a 3 storey building in Shepton Mallet. Having successfully won the project, the next problem was how to carry out the work in a relatively short space of time, over the winter months with snow on the ground and no heating until the air conditioning was commissioned. The building was not a traditional office, in that there were no suspended ceilings (and not the height to fit any), and no raised floors, and the customer wanted lots of walls removed as well as fitting CAT6 cable into floor boxes in all of the floors.

All of the major elements that are used in a conventional office refurbishment were used, electrical work including data cabling, new lighting, reconfiguration of the power between floors, flooring using a rubber insulation floor to reduce sound transfer between floors, new air conditioning throughout, new kitchens on the floors including new appliances.

One of the difficulties was that the work had to be carried out in the winter months and without any heating until the air conditioning system was installed it was freezing on site. We had heaters but you cannot have the heaters on too much as it would dry out the plaster too quickly causing cracking. The paint also did not dry out properly so it just made the project much more difficult to complete. We also had snow to contend with and we lost several days as the guys could not get into work. We did finish the project a week early allowing the customer some more time on getting the IT equipment in.

Existing building photographs

Construction photographs

Office refurbishment

If you need any advice or are thinking of an office refurbishment project please give us a call, we would love to talk to you, on 01380 738844