Categories
All Project Categories Kitchen refurbishment Projects Toilet Refurbishment

Kitchen and Toilet Refurbishment in Bath

Client: Electric Bear Brewing Co.
Value: £18.5k

Cre8tive Interiors was commissioned by Electric Bear Brewing Co. to oversee a comprehensive refurbishment of their customer-facing facilities.

Following the successful launch of their brewery tours, the client sought to elevate the visitor experience by transforming the entrance lobby and restrooms into a more welcoming, brand-aligned environment.

A key component of the brief involved a spatial challenge: reconfiguring a small, ‘makeshift’ tea point into a more functional, modern kitchenette.

Initial design

Form, Function, and Fermentation: A Brewery Refresh

Every successful commercial renovation begins with precision. For our latest project—a modern independent brewery—the goal was to balance a rugged, industrial aesthetic with high-performance utility.

Precision in the Planning

To ensure every square inch was utilized, we began with detailed CAD modeling. This allowed us to accurately map the entrance lobby, facilities, and kitchen areas, ensuring our material costing was as precise as our design. Within the kitchenette, spatial efficiency was the priority. By specifying a slimline dishwasher and a deep single-bowl sink, we managed to maximize the usable worktop surface without compromising on essential functionality.

Industrial Edge Meets Accessibility

The restroom refurbishments needed to reflect the brewery’s brand identity. We curated a moodboard that contrasted dark industrial hardware with clean, contemporary sanitaryware. Diversity and inclusion were also central to the brief; we integrated a dark grey Doc-M pack into the accessible facilities to ensure the aesthetic remained cohesive while meeting all regulatory standards.

A Bright First Impression

The reception area serves as the gateway to the brewery experience. To modernize the space, we focused on “lifting” the environment through new flooring and a high-reflectivity suspended ceiling. The result is a brighter, more inviting entrance that sets the tone for the quality of the craft beer waiting inside.

Existing Kitchen and Toilet

Project walkthrough

Phase 1: Site Preparation and Infrastructure

The project commenced with the complete decommissioning and strip-out of the existing facilities. To support the new kitchenette, we performed electrical chasing to ensure all power points were seamlessly integrated. Following the first-fix electrical work, all surfaces underwent thorough remediation—filling and making good to provide a flawless substrate for the final decorations.

Phase 2: Sanitaryware and Smart Concealment

In the restrooms, our focus was on clean lines and ease of maintenance.

  • Piping & Cabinetry: We installed bespoke boxing to conceal all pipework. This not only created a more streamlined, “high-end” aesthetic but also removed dust-traps, significantly improving hygiene standards and ease of cleaning.

  • The Specification: We specified modern close-coupled toilets with soft-close seats and full pedestal basins to maintain a minimalist look.

  • Accessibility: The DDA-compliant facility was fitted with a contemporary Doc-M pack featuring grey grab rails, ensuring full compliance without compromising the project’s neutral color palette.

Phase 3: Lighting and Ceiling Systems

To brighten the space, the dated ceiling was replaced with a modern suspended system. We utilized flat white tiles paired with high-output LED panels. This combination dramatically increased the ambient light levels while providing a clean, professional finish and improved energy efficiency.

Phase 4: Kitchenette Installation

The new kitchenette was designed to be both durable and stylish, reflecting the brewery’s industrial roots.

  • Cabinetry: A white gloss slab door was chosen for its reflective properties and modern feel.

  • Work surfaces: We paired the cabinetry with a concrete-effect worktop and matching backboard, providing a robust, industrial edge.

  • Integration: Despite the small footprint, we successfully integrated a dishwasher to ensure the space remained fully functional for the Electric Bear team

The Final Reveal:

A Seamless Blend of Style and Utility

The completed project at Electric Bear Brewing Co. is a testament to how thoughtful design can transform even the most utilitarian spaces into brand-aligned environments.

A Dynamic First Impression

The reception area has been completely revitalized. By combining fresh decoration with a new high-performance suspended ceiling and LED lighting, the space now feels open and energized. The standout feature is the industrial chevron-style flooring, which provides a striking visual link to the brewery’s craft-led identity while offering the durability required for a high-traffic visitor center.

The Kitchen: Ingenious Space-Saving

To maximize the footprint of the new kitchenette, we moved away from traditional swing doors. Instead, we installed a bespoke industrial roller shutter. This serves two critical purposes:

  • Spatial Efficiency: It eliminates the “door swing” radius, keeping the walkway clear.

  • Security: It allows the brewery to discreetly secure the staff area from the public during tours. Despite its compact size, the kitchen now offers ample storage, generous worktop space, and the high-spec addition of an integrated dishwasher.

Restrooms: Moody, Modern, and Maintenance-Friendly

The refurbished toilets strike the perfect balance between “warehouse chic” and clinical cleanliness.

  • Design Excellence: We created a sophisticated atmosphere using dark grey feature walls, complemented by matte-black accessories, radiators, and mirrors.

  • Engineered for Hygiene: By boxing in all pipework and installing commercial-grade safety vinyl flooring, we’ve ensured the facilities are as easy to maintain as they are to look at.

  • Atmosphere: Thanks to the carefully positioned LED lighting, the dark aesthetic feels premium and welcoming rather than dim, ensuring guests have a high-quality experience from start to finish.

The Verdict

By blending industrial textures with modern lighting and clever spatial planning, we’ve provided Electric Bear Brewing Co. with a facility that is ready to welcome the public. It’s a space that doesn’t just work better—it looks the part.

Kitchen or Toilet Refurbishment Projects ?

If you would like a kitchen and toilet refurbishment, please do give us a call on 01380 73 88 44, or email us at [email protected] and we would love to help.

Categories
All Project Categories Kitchen refurbishment Projects Toilet Refurbishment

Kitchen and Toilet Refurbishment in Melksham

Client: Novacast
Value: £14k

The aim of the kitchen and toilet refurbishment project for Novacast in Melksham, was to make the toilet more pleasant for the staff and make the kitchen more functional. Both had become a dumping ground and with most of the kitchen broken and unusable.

Then kitchen was replaced with a smaller but more functional tea point with an integrated fridge.

The toilet was replaced with a new close couple toilet and full pedestal basin. This looks much more modern and the boxed in pipework keeps the room looking much cleaner.

Also replaced were the suspended ceilings, lighting and flooring. Everything we usually do for an office refurbishment, so well within our skill set of what we can do.

Preliminary work

We would normally produce sample boards and drawings for kitchens and toilets. This job however was more focused on getting back to a clean and simple standard with functionality being most important.

Existing Kitchen and Toilet

Work in Progress photographs

The first job was to strip out the existing toilet and kitchen.

We installed new electrical chasing into the walls for the kitchen before filling all the holes in the walls and making good ready for decorations.

The toilets had new plasterboard boxing built to hide all of the pipework making it much nicer to look at and whilst being much easier keep clean.

We then replaced the suspended ceiling tiles for modern flat white tiles with fresh bright LED panels.

The new kitchen was a simple but modern grey gloss slab with a concrete worktop and backboard with an integrated fridge an a new smaller water heater.

The toilet got a modern close coupled toilet with a soft close seat along with a full pedestal basin to keep as many pipes out of sight along with a non-concussive tap to save water.

Completed Kitchen and Toilet

Both the Kitchen and Toilet were painted in a crisp white with fresh black laminate skirting and a modern grey oak vinyl flooring for a fresh and clean look.

The finish product was a toilet the staff felt comfortable using and a clean and functional kitchen where staff could make drinks and sit away from their desk.

Kitchen or Toilet Refurbishment Projects ?

If you would like your kitchen or  toilets refurbished, please do give us a call on 01380 73 88 44, or email us at [email protected] and we would love to help.

Categories
All Project Categories Toilet Refurbishment

Multiple Office Toilet Refurbishments in Calne

Client: Fabrinet
Value: £77k

The office toilet refurbishment project for Fabrinet in Calne,  included toilet blocks on each floor as well as the disabled toilet off the reception area. Each had not been decorated or refurbished since the building was built around 20 years ago.

A requirement was also for speed, the work needed to be started between 7 and 10 days from sorting out the specification so we needed to be organised.

As well as replacing all of the vanity units and cubicle systems, all of the sanitary wear, taps and ancillaries were replaced. Also replaced were the suspended ceilings, lighting and flooring. Everything we usually do for an office refurbishment, so well within our skill set of what we can do. The first task as always, is to draw everything and work out the costs versus the finishes to get with the budget. Bearing in mind although the figure seems high, there were 4 big toilet blocks to do, as well as the small disabled toilet at the front of the building so quite a bit of work.

Office toilet refurbishment projects are not a great deal different to residential, only that things like cubicle partitions, vanity units and items like infra-red taps are more likely to be used. The flooring as well tends to be non-slip flooring as it is usually washed down each night by an army of office cleaners that also clean the office areas.

Preliminary work

We would normally produce sample boards and more drawings but we really did not have much time to do anything. We had to work out the costs very quickly and we provided some physical samples of tiles and brochures for the cubicles and we were starting, really quick..

Existing Toilets

Work in Progress photographs

We took over 700 photographs on this project over 6 weeks, below is just some of them. With 4 main toilet blocks and 3 disabled toilet rooms as well we had to run some of the rooms concurrently with work.

Completion photographs

We think that people forget how bad the old toilets were. The grey colour scheme was in keeping with Fabrinet corporate colours and they really needed to be done and we enjoyed carrying out the work.

Toilet Refurbishment Projects for Offices?

If you would like your office toilets refurbished, please do give us a call on 01380 73 88 44, or email us at [email protected] and we would be really interested to see whether we can help.