Factory Refurbishment

Client: Image Factory
Value: £350k

Office and Factory Refurbishment project

This customer wanted a Factory Refurbishment having taken on the old Royal Mail building in Chippenham.

The first photograph below shows a £1m printing machine and Image Factory invested in two of them, along with taking over the old NHS distribution building on Bumpers Farm Industrial Estate. The complete building had to be refurbished, so the main factory along with the offices along the front of the building.

Factory Refurbishment

A large part of this project was electrical. The main factory had no power infra struture at all to power all of the print machines that the Image Factory owned as well as the new ones; so we had to install a heavy power buzz bar system into the factory and prepare the base and ground works for a new substation to be fitted.

In the main factory the floor had to be scrabbled to remove old oils in the concrete floor and then a high quality epoxy paint applied to the floor. All of the beams, walls and other surfaces also had to be painted.

Factory Refurbishment Photographs

Office Refurbishment

As well as the factory itself, the offices at the front of the building had to be completely stripped out and refurbished.

The mezzanine floor had to be turned around and a new jumbo stud fire wall constructed. Below the mezzanine floor we created a new reception area with fire rated ceiling, decorations and flooring. Upstairs included new ceilings, carpets, plastering and decorations as well as a new kitchen. Also fitted upstairs was a new office constructed from Komfort Kameo 75mm demountable partition.

If you need any advice or are thinking of an office refurbishment project please give us a call, we would love to talk to you, on 01380 738844

Categories
All Project Categories Mezzanine Floors Office Refurbishments Partitioning Suspended Ceilings

Office Expansion in Corsham for Coombe Castle

Client: Coombe Castle
Value: £48k

Office Expansion in Corsham

This project consisted of converting a storage unit in to office space in order to provide some much needed office expansion. The project would involve fire protecting a mezzanine floor as this is required by Building Regulations if you have offices above, steel work and a suspended ceiling.  Ventilation had to be put round a chiller and fire sensors had to be installed within the chiller as it could not be moved to fit the fire protected board. Office windows had to be installed to match the rest of the building.

Upstairs needed a complete office fitting, so a suspended ceiling, dry lining the outer walls, decoration of the outer walls,  some fire rated partitioning to create a fire barrier between the offices and warehouse, as well as demountable partitioning within. Full electrical work including CAT2 lighting, 3 compartment perimeter trunking, flooring and new windows were also required. As always we follow our process, so the first step is to understand what the client wants, and then to assess what they have by taking photographs, and drawing everything.

Existing Space Photographs

It is a bit difficult to see from the photos, but essentially we had several areas to deal with. Underneath the mezzanine and on top of it was the main area, but included absolutely everything we do.

Building Regulations

It is crucial to consider Building Regulations when looking at layouts for offices. In particular fire ratings and Building Regulations which is a legal requirement. This particular project needed offices to be fitted on top of a mezzanine floor and so this is why it had to comply to the law.

If you need more information about Building Regulations, we have written a few things here.

Construction and finished photographs.

Office Expansion?

If you have a problem with your existing office space and need it altering as you are running out of space then Cre8tive can help. Please give us a call on 01380 738844.

Categories
All Project Categories Office Furniture Office Refurbishments Partitioning

Office Refurbishment in Swindon

Client: Stibo Reprographics
Value: £67k

The brief was for an office refurbishment in Swindon of the open plan office space. The work included to redecorate the main office, replace the old damaged blinds, new carpet and a small amount of partitioning. We have been working with this customer for several years and were happy they contacted us again for this job.

The open plan office area is very large, about 550sqm, and has several departments and teams mingled in together. The office was also dominated by 2m tall floor screens around each person’s desk, the whole atmosphere was very closed off and disorganised.

Initially we decided removing the screens would open up the office dramatically. We then looked at how the space is used. AutoCAD plans were drawn up to see how the space could be put to best use. The last job we did for the customer was to redesign the conference room with colours chosen from the companies’ logo. A similar colour scheme was chosen for the main office too, with the carpet, desk high floor screens and seating all tied into the colour scheme.

A new manager’s office was built from demountable partitioning and a solid wall closing off the reception was taken down replaced by a new glazed wall, to further help open the office up. The existing blinds were matched by our suppliers and we replaced only the damaged blinds, so making a saving for the customer.

The carpet was laid by our experienced fitters over the weekend and in evening to minimize the amount of time we disturbed the office. Finally some new meeting room furniture was supplied.

Why Demountable Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitions is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Questions about an office refurbishment?

If you are not sure about anything we love to talk about projects and sort out problems and issues with space, if your office needs reorganising or you need a general office refurbishment please give us a call on 01380 738844