Office Design and Refurbishment

Client: Ari Fleet
Value: £92k

An Office Design and Refurbishment Project for Ari Fleet in Chippenham was not initially considered when we visited to discuss some sound problems in their offices. Their concern was that they knew something had to be done, and had prices for furniture and had an idea on what  they liked for carpets, but were not sure how the project could be all tied together, with a total budget, with a list of things that they wanted doing.

The other major problem was that the office space was occupied, so the ground floor area would need to have many people moved around in various phases. So Cre8tive were tasked to pull the whole project together.

The majority of the ground floor space consisted of around 100+ desks. We also had to assess what future capacity we could accommodate due to the future growth plans of the business. The desk layout was important to show this, so we carried some designs and plans.

We felt that an area was needed to encourage staff to meet outside the tea room in a less formal environment and so we allocated some space for this. Our original idea was to have a curved breakfast bar in the bottom corner of the building, joining the two sections of office space together. At this stage the customer thought this a bit too adventurous and they wanted to keep their meeting rooms.

Design and Planning work

Always the first task in a Design and Refurbishment project is to get the space working correctly without focusing at an early point on the product. Once the basic desk plans were agreed we then looked to examine different suppliers, and we selected a couple from Frem and another supplier. We then set up both types of desks from different suppliers in an office for the staff to try out. The staff actually selected the cheaper version which was a surprise. However the staff voted on the selection and Ari Fleet management went with their selection.

We then asked for the corporate colours, we also provided some colour options and carpet choices to show how all of the colours could go together. We were then able to provide budget costs for all of the options. The overall costs including decoration, and the choice of the cheaper furniture met their budget.

We then decided to split the work into three phases so the staff could be moved around the other office space available upstairs, giving time for Ari Fleets’ IT people to disconnect and reconnect desks in between the phases.

Initial Photographs

As you can see from the photographs below the existing screens were red, and the desks were 120 degree. Many years ago this design was quite innovative, but time moves on, particularly there is not the requirement for desk space now with flat screen technology. There is also much less paperwork on desks now, with everything being more electronic.

The carpet was also quite worn in places, although a decent quality when fitted the design is no longer made, so hard to patch and make good, so needed to be replaced. Naturally the carpet wears under desk positions with peoples feet and corridor routes, not much can be done about this.

Phase one side of the building

Quite a bit of work was required to prepare the area as you can see from the photographs. A large gang of furniture fitters was required to install of the furniture in a day allowing the customer time to carry out the wiring and gradually move people over from the other areas. Once we finished our work, we planned in 2 weeks to give the customer time to organise staff before we tackled the next phase. In fact the following area ended up almost running on directly from the previous phase, so much quicker than we thought.

Phase two side of the building

Phase three Breakout area

Completed photographs

Office Design and Refurbishment Projects

We really enjoyed this project. The o-operation that Ari management got from the staff was brilliant as they involved the staff in the process all along. This is always important on larger projects where you are affecting the way people work, if you can involve the staff then managing any change is much easier.

What was really rewarding is the comments from the customer at the end of the video clip. The refurbishment has changed the way the staff work for the better, there is more involvement and closer team working by using the new break out area.

If you would like any help on any project like this please give us a call on 01380 73 88 44 or email us at [email protected]

office design and refurbishment

 

office design and refurbishment

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Projects Storage Walls Visuals

Office Design and Fit Out in Swindon

Client: One Technologies
Value: £260k

We carried out an Office design and fit out fit out project for One Technologies Ltd in Swindon,Wiltshire. The project included creating ideas for the design, detail specification and documents, planning and then organising the work which was completed on time within budget.

The customer is an American company that wanted to set up and office in the UK. They had a breakfast bar in their office in Dallas, we tried to replicate the way they work in the US so part of their culture of how they work comes across into the UK. The customer is a web based company and the new office will be receiving inbound calls so is basically a call center. The image of a phone box in the reception is intended to reflect this and is one reason why there is a  concentration of desks in space. The digital image that is printed on heavy textured wall covering. Desk footprint was important in getting the right numbers in, and we have designed this so they can increase the numbers easily, all of the future space planning has been done. You will see the grey wallpaper in the office is very textured to give some personality to the paper and help with sound performance.

The activities included Office Design, Project Management, CDM regulations, Building Regulations, contracts, stripping out work, demountable glass partitioning, decorations, design of a breakfast bar, supply and fit of all office furniture, air conditioning new and changes to existing, ventilation changes, lighting, electrical work, data cabling, supply and fitting of the communications cabinet, cctv, access control, audio visual equipment and connection, storage wall and flooring changes. We also supplied all of the office furniture, screens, cupboards, plants, graphics, chairs and monitor arms.

Preparation work.

Much of the initial time on the project was spent exploring different layouts and seeing how the space could work. Care was taken in seeing how the customer wanted to use the space to have an area where people could relax and have teas and coffees.

Design Visuals.

We have covered elsewhere in this website our view on visuals. Please click this link for more explanation as to the difference between drawing work, space planning and 3d visuals. As a large proportion of the cost of the project focused around the breakfast bar we felt creating visuals was really important. The breakfast bar being an essential part of the office design. The film taken of this project reinforces how much the finished build reflects the initial visuals we produced for the project. Although they are in the film clip, they can be seen below:

Specifications, contract and planning.

The next step was to provide much more detail in the the specifications in the form of written documents. We had a commercial contract drawn up, as well as produced a full build specification document detailing every aspect of the build. Due to the amounts of money involved £250k +, we produced a project plan which showed the phases of when payments were due to be made depending on when various parts of the project were delivered. The final document was a detailed Gantt chart showing project timelines, dates, slack periods, completion dates and contingencies. Also built in were times required for the American IT team to visit and have all of the computer equipment installed and configured.

Build Photographs.

As you can see from the photographs there was quite a bit to organise, in particular we had to follow the progress to a programme, as well as maintaining dates that had to fit in with the American IT team visiting the UK to install the server the programme had to be met for the financial reasons in order to maintain a steady flow of payments coming to us from the USA. The main office design and fit out project for us was only one small part in order to get the office up and working. The customers IT people only had 3 days to install all of the equipment, so all of the infrastructure cabling, power, air conditioning, cabinets and of course all of the security access controls and cameras had to be fully working before they came over to visit. They were bringing with them a special server built by Dell to handle the call volumes anticipated in the office and the server itself cost 7 figures.

Final photographs finished office.

We are very please with the final office design and fit out. If you have not seen the video in the first part of this page then you can also see it here by here by clicking this text..

Moving / expanding or have problems with your existing office space?

Many offices have problems with sound, problems with fitting enough people in, and may look dated and need reworking which is where we can help. From an initial brief as to what the problems are to the final completed office we can carry out everything that you need inside an office. In the project above we used demountable partitioning but using a special type of glass to enhance sound performance. The system was also a propriety demountable partition system called Komfort Polar. The glass wall was double glazed, with seamless glass joints for a smooth simple look.

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
News Office Furniture Uncategorized

New Bench Furniture Ranges

Cre8tive has been working with a UK manufacturer for a while now and is very excited to be looking at introducing their new range of bench furniture. The image above shows bench furniture designed into a pod arrangement. The main reason for the introduction of this new product is to promote closer team working. Traditional bench type systems where you have long rows of people working are very functional but if the people in the row of desks is working as a team, then the person at one end, will not speak to, or sometime see the other person.

Bench Furniture Ranges.

We have a few projects where we have installed a more traditional bench type system. The word bench is used to describe the cluster of desks that share leg frames. The sharing of leg frames under a bench top has several advantages over conventional radial, wave or straight desks, the first is that the number of components are reduced, thereby reducing costs, and the second main one is that more legroom is created under the desk. The footprint of desks is reducing, and even though people need less working room now with the advent of tablets, laptops and flat screen monitors people forget about what is under the desk. You still need somewhere for the cpu and pedestal, as well as legs and cabling.

The Pod concept allows everyone to be together and yet the screens reduce ambient noise getting out of the pod into the other areas of the office. Cre8tive is working on a couple of schemes where we hope to introduce this product.

For more information please call Cre8tive on 01380 73 88 44

Categories
Air Conditioning All Project Categories Office Furniture Office Refurbishments

Office Refurbishment in Salisbury

Client: Chestergate Financial
Value: £40k

We were asked by this customer to look at the whole office space to address several things, and carry out a general office refurbishment. One of the main problems is that they needed to fit another couple of desk positions and space was limited. Other requirements were to completely re-decorate the offices, and to do something with the existing kitchen. Currently they just had a bit of worktop and had to fill a kettle with water from the toilet which was not ideal.

The carpet needed replacing in the main office and we cleaned the others. The windows were very drafty, and so we allowed to fit some secondary glazing inside the sash windows. Other issues was that the lighting was poor in the corridors and the spot lights were dazzling which made the office difficult to work in. People also tripped up and down the steps so we came up with some step lighting to solve this problem. We fitted a new kitchen and piped the supply and waste through the building to connect to the toilets.

The problem of desk space was solved by using some narrow bench style of desks grouped together in a cluster or bank. The computer screens were then fixed to the desk screens by using gas arms, freeing up desk space.

When we came to decorate the previous decorators had filled in the panels in the meeting room with silicon rather than decorators cork which meant the edges cracked. It all had to be hacked out and filled properly and then repainted.

Original Office Space Photographs

Design and Drawing Work

Drawing is one thing, working out then how it could be done with an occupied office was another. We worked closely with the customer to work out which rooms we could have access to, and how much time we needed for each section before we could move things around.

Construction Photographs

Office refurbishment

If you need any advice or are thinking of an office refurbishment project please give us a call, we would love to talk to you, on 01380 738844

Categories
All Project Categories Office Furniture Office Refurbishments Partitioning Projects Storage Walls

Office Design and fit out in Chippenham

Client: Redlynch Leisure
Value: £27k

Office Refurbishment in Chippenham

Redlynch Leisure wanted to have a new open plan space to have an office design and fit out carried out. The initial space was completely empty and required a complete design with fitting out work, consisting of Interior space planning and design, demountable partitions, storage wall, carpets, creation of canteen area, flooring, decoration and minor electrical work. We also supplied all of the office furniture which was in keeping with the design of the building.

Design and drawing work

We came up with a few different ideas, the customer in the end went for a more traditional layout.

The office design and fit out project also required us to submit plans to Building Control for approval which we obtained on behalf of the client. The major aspects of this office refurbishment project is in using materials which were complimentary to the design of the building. We chose Komfort Klassic timber demountable system which matched the finish of the barn styled windows. The storage wall was chosen to take the place of a partition wall and a cupboard, saving on cost, and fitting with the finishes of the partitions, outside of building and the furniture, which we also supplied and installed. We also had to alter the plumbing and move a radiator in order to install the partitioning. We provided a complete package and all the customer had to do was to move in.

We also put the customer in touch with an IT company and telephone systems company to handle the requirements which we work closely with in projects.

Storage Wall

We designed into this project a product called storage wall. Storage wall combines the function of a cupboard with a partition wall. So we build it up to the ceiling and as the width is around 400mm the thickness of the wall with the contents gives really good sound insulation. It is still demountable, so can be taken down and rebuilt.

Why Demountable Partitioning?

Another key element of this work was that the partitions had to be demountable. There are several reasons why this type of partition should be used in office projects:

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.
Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Projects

Office Refurbishments in Bath

Client: Regency Laundry
Value: £28k

Cre8tive have carried out many office refurbishments over the years and all need to have some design and drawing work done initially and is the most important aspect of a project that needs to be  carried out in order to carry out a project properly. The existing office space had small narrow corridors, a dated partitions system and dark green colours making the space very dark.

We redesigned the office space and used beam system furniture to get computer cables off the floor. We also created a tea point in a cupboard and added some features in the carpet for some added interest in the design. All of the walls had to be redecorated. The refurbishment project consisted of Komfort Kameo 75mm demountable partition system, Gaskell carpet tiles, Armstrong suspended ceiling and Sebastien Indulgence furniture.

Included:

  • Design and drawing work
  • Stripping out of existing
  • Demountable Partitioning
  • Electrical work
  • Air conditioning
  • Flooring
  • Kitchen / tea point
  • Office Furniture

Drawing and Design Work

Working out what the customer wanted meant we had to drawer what they had and come up with several layouts to explore how the office would work for them.

Office Refurbishment Construction Images

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure what to do?

  1. Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.01380 73 88 44
Categories
All Project Categories Office Furniture Office Refurbishments Suspended Ceilings Visuals

Office Fitting out in Trowbridge

Client: Sea Terra Trowbridge
Value: £12.5k

Office Refurbishment

This project involved the office fitting out of an existing office space in order for the company to occupy. The existing office looked quite dated, but the position of the space and the structure suited the customer well. As the office was going to be busy with lots of noise on the phone a suspended ceiling was essential, as well as providing CAT 2 lighting which is needed when working on computers.

Space Planning and design work.

The space was quite small, there was also a requirement to fit a certain number of people inside the office and so a basic space plan was required.Moving on from a basic space plan we applied some colours to the layout as well so the customer had some idea what could be done by using different carpet colours. There is a difference between basic drawing work and space planning, please click on the link for more of an explanation.

Final photographs.

Luckily the office space was empty so it made fitting the suspended ceiling much easier. The original space was just an old shop with a plasterboard ceiling and old fissured (squiggle pattern) tiles which made the space look really dated. The lighting was surface mounted tubed light fittings which are not allowed under the Visual Display Regulations, so they had to be changed anyway to CAT2 at the very least as the customer was using computers.

The project included the installation of a new suspended ceiling, new CAT 2 lighting & electrics,  new flooring, decoration and furniture. The ceiling was slightly tricky as the existing space had arches located centrally within the space.

Suspended Ceiling

Suspended ceilings are almost always used when carrying out an office refurbishment as existing ones can look tired. We have a bit more information on suspended ceilings on the following link if you would like to have a look, please click this link. The choice of the suspended ceiling is almost always price versus performance. It is possible to have a plasterboard ceiling but the problem with this type is that it is very hard to get services over the ceiling with access problems, and the hard surface of the ceiling lets the sound bounce around. The mineral fibre tiles that are generally used offer good sound absorption properties, and can easily be taken out to get to any cabling that you may wish to run over the grid system.

We also install all our ceilings with a self leveling laser to so the ceiling is completely flat. Some builders try and put ceilings in and we do often have to put them right, it is important to get the supporting wires tensioned properly as well as centering the grid system properly so it looks evenly balanced in the space.

The furniture chosen was a beam system type of furniture which allows cables to be hidden in an integral beam that joins the leg frame uprights together.

Please give us a call on 01380 73 88 44 for more information about this project or any requirement you may have.

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Suspended Ceilings

Office Refurbishment in Bristol

Client: Smurfit Kappa
Value: £65k

Office Design and Refurbishment in Bristol

Our client wanted a complete redesign refurbishment of the existing office space. The first task was to come up with some ideas and some colour schemes, the director wanted an adventurous new scheme, so we focused upon creating a more spacious effect through introducing new concepts of Lighting, Suspended Ceiling, Partitioning, new Air Conditioning systems, Flooring and Furniture in order to create a more relaxed office environment that mixes bold contemporary colour and natural materials.

Design and Drawing work

In working out what needs to be done, we need to know what is there. A detailed drawing showing positions of electrics and the walls was produced. The new layout required a few designs, and in particular the Director wanted to have a meeting end on his new desk, so we had to design a desk and get it made particularly for him.

Colour scheme / Design

As this area was a completely separate area from the upstairs directors suite, we thought that the whole scheme could be different. The room was completely separate from the rest of the building, so when you walked in, there was a different feel which was modern, had a blend of the traditional timber partitions, along with some stripy carpet, and the middle solid carpet was a very high quality cut pile carpet which felt soft and luxurious underfoot. One of the main requirements was that the Managing Director wanted a meeting end on his desk and it was not possible to get one to fit from standard product ranges. We therefore had to get one made..

Existing space

As you can see from the photographs the whole area needed completely stripping out and replacing.

Stripping out and building photographs

I always like this phase as the office transforms, from a very dull space to something new. We do get an immense level of satisfaction in carrying out office refurbishment projects for this reason.

Final photographs

As you can see from the final photographs, Cre8tive were successful in carrying out a complete redesign and office refurbishment of the customers existing space.

Why Demountable Office Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
All Project Categories Office Furniture

Reception Desk in Bristol

Client: Bristol City Council
Value: £29k

Design and Drawing work

We had carried out several jobs in the past for Bristol City Council, and we were approached to re-fit the reception at their Customer Services Point at Waring House. The main feature of the area was to design, build and supply a new reception desk and to make the meeting rooms appear open with Demountable Partitions using glass.

Offsite and on site fabrication and assembly

The way to make this size of reception desk is to make it off site in the workshop and then assemble it on site.

Finished reception desk

The extent of our work finished at the final photo above. They were they going to carpet up the front face of the desk and top as they found that their customer wore this section of the desks out first. The carpet tiles could be replaced. They also finally decorated various parts of the desk as they wanted to do this, so that was reflected in the price. The overall effect was actually pretty impressive.

Special Projects

We can get pretty much anything made. This particular desk did have some design input from us as the Council took us to several other sites, in the end this was the Councils’ design and hey were very pleased with it.

If you need any reception desks or anything unusual made, please do not hesitate to contact us on 01380 73 88 44, or email us at [email protected]

Categories
All Project Categories Office Furniture Office Refurbishments

Reception Refurbishment

Client: Smurfit Kappa
Value: £49k

We have been working with the customer over a number of years and they wanted us to come up with some ideas on how to deal with the customer interface into the factory. The brief was to redesign carry out a reception refurbishment to represent a modern clean and welcoming customer entrance into the building.

The total open area was vast, dominated by an open egg crate ceiling, dull lighting, brick walls with a dark oppressive atmosphere, and a dated looking ceramic tiled floor with a mosaic of colours pinks and dark greens. The reception office was situated in a brick built room at the far end of the open foyer area.

What we did was to look at the area that was important and that is the meet and greet to potential customers and suppliers by the entrance doors, and guiding important visitors into the main boardroom upstairs, or the CEO’s offices which were situated just off the main entrance doors.

We therefore came up with the idea of bringing the whole reception area towards the main entrance doors and just focusing on this area. We would then leave the majority of the area behind a glass wall alone and focus on the main lobby. By doing this, it also meant that we could meet the customers budget. It would simply cost too much to deal with the whole area.

Existing customer experience into Reception

Reception Refurbishment construction photographs

CDM and Health and Safety

The duration of the project and the number of people on site, as well as the access issues meant that we had to employ a Heath and Safety consultant to carry out a risk assessment and discuss with the client safe fire exit routes and means of protection from the staff whilst we were doing the work.