All Project Categories Suspended Ceilings

Suspended Ceiling in Trowbridge

Client: Zircon Software
Value: £23k

Suspended Ceiling and Alteration work

We completed this replacement suspended ceiling project for Zircon Software in Trowbridge who moved to new premises. The existing ceiling was very tired, so we produced a lighting scheme along with some drawings to present to the customer with the costing. We supplied new suspended ceilings and lighting throughout and also took out a couple of walls for them. The work carried out here is typical of what we call dilapidation work, in that the work is needed for someone moving in to be able to occupy it in a reasonable state.

Categories
All Project Categories Design Office Refurbishments

Refurbishment Projects in Bristol- Innovations Centre

Client: Smurfit Kappa
Value: £118k

Office Refurbishment Projects

We have carried out several refurbishment projects for Smurfit Kappa over the years and the customer had every confidence that we could deliver. The project had to be run under the Construction Design and Management Regulations (CDM) due to the time on site, and the number of fixers on site as well. Please click the link to go the page which explains more about CDM.

The office refurbishment project was made more complicated as the main staircase had to made available whilst the work was carried out, so planning and carrying out the appropriate risk assessments was important.

Office Refurbishment Scope of Work

The work included:

  • Initial project brief
  • Development of ideas with the customer
  • Drawings, designs, 3d visuals
  • Costing
  • Liaising with on-site Health and Safety advisors, production of Health and Safety Plan.
  • Running the project under CDM
  • Completion on time within budget

Supply and fit of: stripping out, electrical work, flooring, lighting design, office furniture, design of colours and specification of finishes, air conditioning, decoration and construction of a curved presentation wall and fitting the customers own artwork.

Initial photographs of existing space

This was essential to try and work out what we were dealing with. The constraints as well had to be considered which mainly revolved around agreeing access times to get materials up and down the main staircase. First task is always to take loads of photos, measurement, then to go away and think about it.

Initial Designs

The first step in any office refurbishment projects that needs design is to work out the basic space plan first, once this was done we produced a series of the 3d visuals to help the client understand what the space may look like, and use this tool to further refine and ensure that the customer will get exactly what they want.

Detailed drawings

Once the design was approved the next task was to detail up the drawings to ensure that we produced exactly what the customer wanted. The table for the downstairs meeting room was made to a Smurfit Kappa specification and design. We had to squeeze it in to the space however which was a bit difficult.

Construction Photographs.

One of the tricky things to do was to actually get to the height of the roof using mobile towers. The insulation had to be tacked in place so it did not slip down the roof, everything boarded, tape and jointed then painted, all working 5 meters off the floor.

There are so many awkward angles, it is hard to show with photographs the geometry of everything.

Final Photographs

The final result was a mixture between the original design that we did and adjustments made by the client. The actual box wall itself was made by the customer as this is what they do, construct things in cardboard. We had to give them the curve and they did the rest. Overall the customer was very happy with the result

Similar Project?

Although it is very unlikely that we will ever come across a project exactly the same, the same basic principles in what we do are carried through all projects.

If you are stuck for ideas but know that something needs to be done, please give us a call on 01380 73 88 44 or email us at [email protected]

Categories
All Project Categories Partitioning Projects Storage Walls

Storage Wall and Demountable Partitions

Client: Cole Easdon Consultants Swindon
Value: £10k

Storage wall with demountable partitions

Cole Easdon approached us with a couple of requirements for their new office in Swindon. The first was to construct a couple of office but they also had a major problem with storage. We realised that we could utilise the full height of the ceiling and use a product called storage wall, which is a full height cupboard constructed and fitted to the underside of the suspended ceiling which acts like a partition. We then built some demountable partitions off the storage wall to solve the problem.

Storage Wall Project photographs

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall

Storage wall or Partitioning questions?

We have been supplying and fitting storage wall and demountable partitioning as part of our main refurbishment projects for over 15 years, if you are unsure about anything please give us a call.

Please give us a call on 01380 73 88 44.