Categories
All Project Categories Partitioning Suspended Ceilings

Building Regulation Performing Fire rated Partitions

Client: Webbs Motor Caravans
Value: 28k

Fire Rated Partitions

The difficulty with this project was that the client required offices above a mezzanine floor which means that the partitions below have to be fire rated, normally this means the glass has to be georgian wired. In this case we were able to use pyrocet clear glass to still give the 30 minute fire rating and yet not spoil the overall look of the offices.

The fire rated partitions system chosen was Komfort 75mm demountable partition system which allowed us to provide insulation inside the walls to give some degree of protection from the cold when the double doors to the showroom were opened to move caravans in and out. We could have used a cheap general 25mm thick partition roll which 99% of companies use as it is cheap, but in this case we used a Rockwool rw45 slab material designed to be better for insulation.

Partition Construction photos

Not shown are the suspended ceilings ceilings that we had to fit inside the offices. The one in the lower offices had to be 1 hour fire rated to give protection to the mezzanine floor. You can also see from the photographs the pink looking plasterboard on the metal columns of the mezzanine floor, this is fire protection board.

Fire rating and Building Regulations, not sure what to do?

Just give us a call or email. We understand partitioning and Building Regulations so can solve most problems. When it comes to offices it is crucial to protect people from any potential fire, the key is to make sure that the partitions give enough protection to allow people to escape. It is not acceptable to cut corners, so we always give the correct advice.

01380 73 88 44 or email: [email protected]

Categories
All Project Categories Office Refurbishments Partitioning Storage Walls Suspended Ceilings Toilet Refurbishment

Head Office Design and Refurbishment Work

Client: De La Rue
Value: £200k

Office Refurbishment in Bath

The Administration Building looked very dated and did not represent the image De La Rue wanted to present to their customers. The building needed a thorough interior office refurbishment and design to create an environment in which staff feel empowered and involved and to portray the right professional image to visitors to reflect the high company values.

As the company uses wood pulp in the production of security papers, an earthy feel was required to the design. Due to the size of the project the work had to be carried out under the Construction Design and Management Regulations (CDM) which applies to any construction type work taking longer than 30 days or employing more than 5 people on site at any one time. Cre8tive was employed as a principle contractor, and the client employed a Heath and Safety Consultant to help run the project safely. The office refurbishment had a strict timetable of 8 weeks for completion.

Design Work

The design process took around 3 months. The initial proposal was made in competition with another company in which we were able to convince the customer that we had the skills to deliver, as well as come up with a good design. The first step is to measure everything and work out who does what where before moving onto the plan. We thought upstairs the best thing to do was to take out as much of the upstairs walls as possible to let as much natural light into the space. Unfortunately the walls upstairs held up the roof, so we had to employ a structural engineer to do some calculations and fit some steels to the beams. Downstairs also required opening out, and a beam had to be fitted downstairs.

Initial site photographs

Construction / demolition photographs

Office Refurbishment Project?

If you need some office design as you are unsure what to do Cre8tive can help, regardless of the size of the project we like to be Cre8tive with what we do with the space. As well as all of the practical things such as running the project as Principle Contractor, dealing with Health and Safety and running the project well we add something extra and that is the Cre8tive effect.

Please give us a call on 01380 73 88 44

Categories
All Project Categories Consult Install Office Refurbishments Partitioning

Office Fit Out British Nuclear Group in Bridgewater

Client: British Nuclear Group
Value: £99k

Cre8tive were contacted by an Office Furniture company as they were not able to deal with the office fit out side of the project for British Nuclear Group. The customer had already employed an architect to specify what was required and so it was really a case of demonstrating that we knew what we were doing and that could cost the project to meet the clients budget. This project took place on the ground floor of Mallard Court.

The project was designed by Oxford Architects who specified the partition system.

The project was a 6 week duration project which had to run under the Construction Design and Management regulations. Cre8tive Interiors acted as Principle Contractor on the project. The office fit out  for British Nuclear Group consisted of Komfort Double Glazed Polar Demountable Partition System, as well as single glazed Polar screens and Komfort Komfire 100 partitions. The project also included supplying and fitting of a kitchen from Howdens, new carpets, fitting of fire barriers in the ceiling and floor voids, and complete decoration of the workspace.

Initial design and drawing work

Initial site photographs before work

Construction Photographs

Working for the British Nuclear Group had it’s challenges. As you would expect every aspect of the work was scrutinized, we also had to have a permanent person on site all of the time which sometimes on projects like this we do not always need to have fitters doing work whilst other work is being done by others. BNG contracted their own duct work people, so they had to carry out some works when we had to be off site.

Completed Photographs

Why Demountable Partitioning?

This particular project had what we call demountable partitioning in it. Landlords insist on this type as it can be easily relocated without doing much damage to the building.

  1. Demountable partitioning is tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Need an Office Fitting out?

This particular project was driven by BNG with a design carried out by Oxford Architects. We were the contractor who completed the work. If you need any design work doing we can do this, as well as being the principle contractor for the work.

Any questions please do not hesitate to contact us on 01380 73 88 44 or email [email protected]

Categories
All Project Categories Partitioning Projects Storage Walls

Storage Wall and Demountable Partitions

Client: Cole Easdon Consultants Swindon
Value: £10k

Storage wall with demountable partitions

Cole Easdon approached us with a couple of requirements for their new office in Swindon. The first was to construct a couple of office but they also had a major problem with storage. We realised that we could utilise the full height of the ceiling and use a product called storage wall, which is a full height cupboard constructed and fitted to the underside of the suspended ceiling which acts like a partition. We then built some demountable partitions off the storage wall to solve the problem.

Storage Wall Project photographs

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall

Storage wall or Partitioning questions?

We have been supplying and fitting storage wall and demountable partitioning as part of our main refurbishment projects for over 15 years, if you are unsure about anything please give us a call.

Please give us a call on 01380 73 88 44.