Office Design and Fit Out in Chippenham

Client: Deltenna
Value: £18k

Office Design and fit out in Chippenham

This project needed some office design to include constructing an end office using demountable partitioning, supply and fitting of a new Howdens kitchenette, smoke detectors and fire alarms, supplying and fitting new carpets and office furniture to a design co-ordinating the whole colour scheme.

In trying to come up with something a bit more interesting we came up with a couple of options, as the function of the space in terms of where the office had to go was quite limiting, we played around with the carpet design and came up with a few ideas. Building the demountable partition was difficult as the roof was vaulted with tie bars, the demountable partition was built around the tie bars so they were hidden in the wall, we then tape and jointed the wall and decorated it to finish it. The vision panel in the door was the same size as the outside window maximising the light through into the main office. We also had to submit the plans for Building Control Approval which we obtained on behalf of the client.

Project Photos

Design Projects

We have many ideas on how to make the best use of space, and we are seeing offices and talking to customers all of the time. Over the years we have seen many projects and often have to work to a budget. What we do is get the space working right first and then focus on the budget. In this case the budget was very tight so we ended up using a very cheap carpet which did not affect the design of the office, and just brought it into the manageable level for the customer. This project was leased over 3 years. Please contact us for further information about leasing and financing.

If you are struggling to come up with something, please do not hesitate to give us a call 01380 73 88 44 or email us on [email protected]

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Suspended Ceilings

Completely New Design of the Existing Office Space in Bristol

Client: Smurfit Kappa
Value: £65k

Office Design and Refurbishment in Bristol

Our client wanted a complete redesign refurbishment of the existing office space. The first task was to come up with some ideas and some colour schemes, the director wanted an adventurous new scheme, so we focused upon creating a more spacious effect through introducing new concepts of Lighting, Suspended Ceiling, Partitioning, new Air Conditioning systems, Flooring and Furniture in order to create a more relaxed office environment that mixes bold contemporary colour and natural materials.

Design and Drawing work

In working out what needs to be done, we need to know what is there. A detailed drawing showing positions of electrics and the walls was produced. The new layout required a few designs, and in particular the Director wanted to have a meeting end on his new desk, so we had to design a desk and get it made particularly for him.

Colour scheme / Design

As this area was a completely separate area from the upstairs directors suite, we thought that the whole scheme could be different. The room was completely separate from the rest of the building, so when you walked in, there was a different feel which was modern, had a blend of the traditional timber partitions, along with some stripy carpet, and the middle solid carpet was a very high quality cut pile carpet which felt soft and luxurious underfoot. One of the main requirements was that the Managing Director wanted a meeting end on his desk and it was not possible to get one to fit from standard product ranges. We therefore had to get one made..

Existing space

As you can see from the photographs the whole area needed completely stripping out and replacing.

Stripping out and building photographs

I always like this phase as the office transforms, from a very dull space to something new. We do get an immense level of satisfaction in carrying out office refurbishment projects for this reason.

Final photographs

As you can see from the final photographs, Cre8tive were successful in carrying out a complete redesign and office refurbishment of the customers existing space.

Why Demountable Office Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
All Project Categories Office Refurbishments Partitioning Storage Walls Suspended Ceilings Toilet Refurbishment

Head Office Design and Refurbishment Work

Client: De La Rue
Value: £200k

Office Refurbishment in Bath

The Administration Building looked very dated and did not represent the image De La Rue wanted to present to their customers. The building needed a thorough interior office refurbishment and design to create an environment in which staff feel empowered and involved and to portray the right professional image to visitors to reflect the high company values.

As the company uses wood pulp in the production of security papers, an earthy feel was required to the design. Due to the size of the project the work had to be carried out under the Construction Design and Management Regulations (CDM) which applies to any construction type work taking longer than 30 days or employing more than 5 people on site at any one time. Cre8tive was employed as a principle contractor, and the client employed a Heath and Safety Consultant to help run the project safely. The office refurbishment had a strict timetable of 8 weeks for completion.

Design Work

The design process took around 3 months. The initial proposal was made in competition with another company in which we were able to convince the customer that we had the skills to deliver, as well as come up with a good design. The first step is to measure everything and work out who does what where before moving onto the plan. We thought upstairs the best thing to do was to take out as much of the upstairs walls as possible to let as much natural light into the space. Unfortunately the walls upstairs held up the roof, so we had to employ a structural engineer to do some calculations and fit some steels to the beams. Downstairs also required opening out, and a beam had to be fitted downstairs.

Initial site photographs

Construction / demolition photographs

Office Refurbishment Project?

If you need some office design as you are unsure what to do Cre8tive can help, regardless of the size of the project we like to be Cre8tive with what we do with the space. As well as all of the practical things such as running the project as Principle Contractor, dealing with Health and Safety and running the project well we add something extra and that is the Cre8tive effect.

Please give us a call on 01380 73 88 44

Categories
All Project Categories Design Office Refurbishments

Refurbishment Projects in Bristol- Innovations Centre

Client: Smurfit Kappa
Value: £118k

Office Refurbishment Projects

We have carried out several refurbishment projects for Smurfit Kappa over the years and the customer had every confidence that we could deliver. The project had to be run under the Construction Design and Management Regulations (CDM) due to the time on site, and the number of fixers on site as well. Please click the link to go the page which explains more about CDM.

The office refurbishment project was made more complicated as the main staircase had to made available whilst the work was carried out, so planning and carrying out the appropriate risk assessments was important.

Office Refurbishment Scope of Work

The work included:

  • Initial project brief
  • Development of ideas with the customer
  • Drawings, designs, 3d visuals
  • Costing
  • Liaising with on-site Health and Safety advisors, production of Health and Safety Plan.
  • Running the project under CDM
  • Completion on time within budget

Supply and fit of: stripping out, electrical work, flooring, lighting design, office furniture, design of colours and specification of finishes, air conditioning, decoration and construction of a curved presentation wall and fitting the customers own artwork.

Initial photographs of existing space

This was essential to try and work out what we were dealing with. The constraints as well had to be considered which mainly revolved around agreeing access times to get materials up and down the main staircase. First task is always to take loads of photos, measurement, then to go away and think about it.

Initial Designs

The first step in any office refurbishment projects that needs design is to work out the basic space plan first, once this was done we produced a series of the 3d visuals to help the client understand what the space may look like, and use this tool to further refine and ensure that the customer will get exactly what they want.

Detailed drawings

Once the design was approved the next task was to detail up the drawings to ensure that we produced exactly what the customer wanted. The table for the downstairs meeting room was made to a Smurfit Kappa specification and design. We had to squeeze it in to the space however which was a bit difficult.

Construction Photographs.

One of the tricky things to do was to actually get to the height of the roof using mobile towers. The insulation had to be tacked in place so it did not slip down the roof, everything boarded, tape and jointed then painted, all working 5 meters off the floor.

There are so many awkward angles, it is hard to show with photographs the geometry of everything.

Final Photographs

The final result was a mixture between the original design that we did and adjustments made by the client. The actual box wall itself was made by the customer as this is what they do, construct things in cardboard. We had to give them the curve and they did the rest. Overall the customer was very happy with the result

Similar Project?

Although it is very unlikely that we will ever come across a project exactly the same, the same basic principles in what we do are carried through all projects.

If you are stuck for ideas but know that something needs to be done, please give us a call on 01380 73 88 44 or email us at [email protected]