Very Large Suspended Ceiling Project in a Warehouse

Client: Connaught
Value: £35k

Suspended Ceiling

This suspended ceiling project involved two buildings, one very large area and the photograph above showing the front offices. The suspended ceilings were part of a main factory refurbishment project for one of their clients. Working for a Main Contactor meant we had to fit our schedule in with other trades which is always difficult without having tight control on site with every aspect of the project.

Existing photographs

The pictures below show the state of the place when we first looked at it. A considerable amount of debris was on the floors and the main contractor was in the process of dismantling everything and clearing away the site.

Suspended Ceiling Construction photographs

Note the fire barrier that we had to install half way down the building.

We did give some advice on the selection of the tile, as the one that was specified was very expensive, and so we chose an alternative which was not much cheaper on the cost per square meter, but on 1200 square meters it made a difference to the customer.  Other areas such as stair wells and the entrance used an MF ceiling construction which is metal framework construction with plasterboard screwed to the frame, taped and jointed and then decorated in a neutral colour.

Suspended ceiling problems?

There are many types of suspended ceilings available, please click this link for more information. We have been supplying and fitting suspended ceiling systems as part of our main refurbishment projects for a number of years, if you are not sure on what can be done please give us a call.Please give us a call on 01380 73 88 44.

Categories
All Project Categories Mezzanine Floors Office Refurbishments Partitioning Suspended Ceilings

Office Expansion in Corsham for Coombe Castle

Client: Coombe Castle
Value: £48k

Office Expansion in Corsham

This project consisted of converting a storage unit in to office space in order to provide some much needed office expansion. The project would involve fire protecting a mezzanine floor as this is required by Building Regulations if you have offices above, steel work and a suspended ceiling.  Ventilation had to be put round a chiller and fire sensors had to be installed within the chiller as it could not be moved to fit the fire protected board. Office windows had to be installed to match the rest of the building.

Upstairs needed a complete office fitting, so a suspended ceiling, dry lining the outer walls, decoration of the outer walls,  some fire rated partitioning to create a fire barrier between the offices and warehouse, as well as demountable partitioning within. Full electrical work including CAT2 lighting, 3 compartment perimeter trunking, flooring and new windows were also required. As always we follow our process, so the first step is to understand what the client wants, and then to assess what they have by taking photographs, and drawing everything.

Existing Space Photographs

It is a bit difficult to see from the photos, but essentially we had several areas to deal with. Underneath the mezzanine and on top of it was the main area, but included absolutely everything we do.

Building Regulations

It is crucial to consider Building Regulations when looking at layouts for offices. In particular fire ratings and Building Regulations which is a legal requirement. This particular project needed offices to be fitted on top of a mezzanine floor and so this is why it had to comply to the law.

If you need more information about Building Regulations, we have written a few things here.

Construction and finished photographs.

Office Expansion?

If you have a problem with your existing office space and need it altering as you are running out of space then Cre8tive can help. Please give us a call on 01380 738844.

Categories
All Project Categories Suspended Ceilings

Suspended Ceiling in Melksham sub station

Client: Melksham Sub Station
Value: £4k

We were called in to look at Melksham sub stations‘ meeting room and staff room as there were a few problems with the inside of the room. The existing ceiling at the sub station was just exposed to the roof. As well as looking unsightly, the rooms were generally noisy as any sound bounced off the hard surfaces of the roof without being absorbed. The sub station also lost heat through the roof space, so the requirement was to install a new ceiling in a couple of rooms which would solve these issues. Instead of the usual CAT2 louvred lighting we fitted LG3 indirect/direct fittings which reduce any shadow around the edge of the room. A suspended ceiling was the obvious answer.

Choosing the right suspended ceiling tile is important to get the right balance between how the ceiling will look, its performance, (often related to sound and insulation), and of course cost. Cre8tive usually presents some options with some recommendations which then the customer can chose the right combinations to the budget that is available. In this instance we did not believe in presenting the cheapest tile for the cheapest price, which is what many companies do, but for not very much more they got a massively different look to the ceiling. The client also spent a bit more money in getting the correct lighting sorted and ended up with exactly what they wanted.

Construction and finished photographs

Not sure what Suspended Ceiling to have?

There are many different types of suspended ceilings, and we have selected a good quality plain faced tile in this case, which will not bow if it gets a bit of moisture, and is nice a bright. The lighting was important, as traditional CAT2 lighting creates shadows around the walls, we chose LG3 which throws light back into the diffuser producing less shadows around the edges of the walls.

There are many different types of suspended ceilings and the range of tiles now can be quite baffling. The current trend is to focus on sound performance within the office and this can be dealt with by using a special tile.

Suspended ceilings are used for a number of reasons, they are quick to install and mean that all the services required for offices such as pipework for plumbing and air conditioning, as well as power and data can be hidden out of sight. Access to the services is also much easier than using a traditional plasterboard or MF type ceiling as the ceiling tiles just need to be lifted from the grid.

There are many offices with old fissured tiles, with sagging tiles and a mottled grey look they make the office look very dated. We like to fit nice white clean tiles to give a fresh look.

If you want to improve sound performance for a space, or want to hide some services, or have any questions about suspended ceiling types please give us a call on 01380 73 88 44

Categories
All Project Categories Suspended Ceilings

Angled Insulated Suspended Ceiling in a Church Hall in Swindon

Client: Walcot Church
Value: £5.6k

When we visited the church initially the problem they had was that it was very cold and they had some problems with the other areas out the back of the main hall as well. We could have run a suspended ceiling right the way across the hall level at one height. It would have been easy to do and cheaper. There was actually quite a bit of height in the slope of the roof so we suggested we follow the line of the roof and try and get the ceiling as high as we could.  We also suggested a special ceiling tile with high insulation properties which the church went for.

Suspended Ceiling Projects

There are many different types of suspended ceilings and the range of tiles now can be quite baffling. The current trend is to focus on sound performance within the office and this can be dealt with by using a special tile.

Suspended ceilings are used for a number of reasons, they are quick to install and mean that all the services required for offices such as pipework for plumbing and air conditioning, as well as power and data can be hidden out of sight. Access to the services is also much easier than using a traditional plasterboard or MF type ceiling as the ceiling tiles just need to be lifted from the grid.

There are many offices with old fissured tiles, with sagging tiles and a mottled grey look they make the office look very dated. We like to fit nice white clean tiles to give a fresh look.

If you want to improve sound performance for a space, or want to hide some services, or have any questions about suspended ceiling types please give us a call on 01380 73 88 44

Categories
All Project Categories Mezzanine Floors Office Refurbishments

Mezzanine Floor Extension Project in Salisbury

Client: Quality Lifts
Value: £44k

Cre8tive were asked to look at a new mezzanine floor extension for Quality Lift Products based at Whaddon Business Park in Salisbury. The project was really interesting as there were many different things to consider.

As well as working out the office layout and lighting, we helped the client organise a number of things themselves in order to keep costs down to a minimum and in effect only used us for doing the specialist work of dry lining, tape and jointing, demountable partitioning, commercial flooring, suspended ceilings and contract wall covering. A small detail was that inside the lower room, the customer wanted the floor plates sunk into the concrete so maximise the space and so that there were no unsightly bolts sticking up out of the floor. The difficulty with this, is that you cant just cut a hole in a concrete floor, you have to check that the composition will be strong enough to support the weight of the mezzanine and that you do not go down too deep affecting the structure of the floor. Cre8tive obtained some specialist advice before carry out the work. The floor was extremely hard to cut and needed a petrol disc cutter with water cooling to achieve it.

Initial Space

Mezzanine Floor Construction Photographs

Final Photographs

Office Extensions

If you have warehouse space and want to extend your offices then we would be delighted to offer some free advice. We are interiors specialists and not a dedicated mezzanine floor manufacturer, as we just sub contract the steel work out, we do what we always do and use our experience in looking at the inside space to make sure it works for the client. In this case, they did not want the cost of moving the lift and needed more space, and so we advised them that we could build around the problem which they did not think was possible. Over the years we have experienced many problems like this and we can usually come up with a solution.

Please give us a call to discuss any projects on 01380 73 88 44, or email us on the contact form of the website.

Categories
All Project Categories Suspended Ceilings

Suspended Ceiling for Chippenham Motor Co

Client: Chippenham Motor Co
Value: £41k

The suspended ceiling for Chippenham Motor Co. was very complicated to achieve, particularly the upstairs profile where the customer required a vaulted roof line in two directions. Downstairs consisted of a series of 8 ceiling pockets formed by many bulkheads joining each other

Downstairs

The pockets had to be lined square to each other so that each ceiling set inside it looked square to the one either side of it in both directions. As we were aware of this, we ended up cladding the beams with fireline board so that we could angle them so that the sides were straight and parallel. If someone else would have done them, they would not have worried about the ceiling, and each pocket would then have angled cuts along each of the sides. Although this may appear trivial to many people and most fitters probably would not have worried about it, just clad the beams as quickly as possible and fitted the grid, then the customer would have got a poorer job. As it is the pockets are all square and you do not see any unsightly angles as Cre8tive takes a pride in making sure that things are carried out properly.

Upstairs

The upstairs ceiling was actually very complicated to do as the customer wanted to maximise the head room upstairs but it was not possible to raise it completely due to the edges of the building. We therefore set another ceiling higher, beyond the outer edges. The difficulty with this is in lining up all of the grids so that it would look right. In the time allocated to do the upstairs ceiling, a good 25% of the time nothing was actually built, the time was spent setting out the dimensions and working out all of the angles. As you can see we left some of the tiles out so that other services could be fitted, but if you are ever in Chippenham, please visit the Chippenham Motor Company and you will see what we mean. (They also sell cars).

Suspended Ceiling Requirements?

We have been supplying and fitting suspended ceiling systems as part of our main refurbishment projects for a number of years, if you are not sure on what can be done please give us a call, the more unusual and difficult the better.

Please give us a call on 01380 73 88 44.

Categories
All Project Categories Partitioning Suspended Ceilings

Office Fitting in Melksham on a Mezzanine Floor

Client: Coombe Castle
Value: £62k

Cre8tive was asked to help carry out an office fitting project for Coombe Castle,who were moving from Corsham to Melksham. The work on this started 6 months ago, once the customer had in mind what they wanted to do, Cre8tive carried out a detailed plan of the building. This involved taking accurate measurements of all of the inside and outside space, in particular determining where all of the cabling went.

Cre8tive then designed the position of the new canteen and offices that were required on the existing mezzanine floor. The only problem was that the roof height was over 4 meters high, and Building Regulations says that you have to have 1 hour fire separation between offices and warehouse, so we devised a specification to meet this.

Other requirements for office fitting included spaces that need ventilation and heating, so Cre8tive had to extended the existing heating system, and fit a VAM  unit within the ceiling void to take air from the outside to the inside.

The office fitting project included data cabling the existing offices as well as the new, providing all electrical, flooring, kitchen, decorations and suspended ceiling for the space.

Drawing and specification work.

We produced many drawings for each of the areas that we had to work on. This included work to the front offices, so they needed power and data, lighting, repairs to the suspended ceiling and new carpet. Other areas included:

  1. Repairing some of the panels in the toilets.
  2. Stripping out the existing kitchen and canteen, converting into a new Sales office.
  3. Providing all of the plumbing requirements for the clean room area downstairs.
  4. Building new offices and canteen on top of the mezzanine floor which had to meet building regulations.
  5. New heating and ventilation.
  6. New comms rack.
  7. Painting much of the outside block walls white.
  8. Building a couple of offices on the shop floor, again these had to be 1 hour fire rated.

Existing building photos before work

Construction photos

Completion photographs

Project Management..

We have many ideas on how to make the best use of space, and we are seeing offices and talking to customers all of the time. Over the years we have seen many projects and often have to work to a budget. What we do is get the space working right first and then focus on the budget. In this case the budget was very tight so we ended up using a very cheap carpet which did not affect the design of the office, and just brought it into the manageable level for the customer. This project was leased over 3 years. Please contact us for further information about leasing and financing.

01380 73 88 44 or email us at [email protected]

Categories
All Project Categories Suspended Ceilings

Suspended Ceiling and Partition Reconfiguration work in Trowbridge

Client: Zircon Software
Value: £23k

Suspended Ceiling and Alteration work

We completed this replacement suspended ceiling project for Zircon Software in Trowbridge who moved to new premises. The existing ceiling was very tired, so we produced a lighting scheme along with some drawings to present to the customer with the costing. We supplied new suspended ceilings and lighting throughout and also took out a couple of walls for them. The work carried out here is typical of what we call dilapidation work, in that the work is needed for someone moving in to be able to occupy it in a reasonable state.