Categories
All Project Categories Partitioning

Demountable Partitions in Chippenham

Client: Bank House Financial Management
Value: £6k

Privacy and confidentiality were a requirement for the demountable partitions for Bank House. The demountable partitions also had to match an existing demountable partition system already in the building which was no problem to achieve.

The system is 100mm wide with 4 layers of plasterboard for addded sound insulation. We also had to re-route the ventilation grills to suit the layout and provide the office furniture for the offices which was supplied by Sebastien furniture for business. As you can see from the photographs the design is quiet dated now, using Satin Anodised Aluminium frames and black laminate skirting. More modern designs move away from the black colour and the frames are available powdercoated white or grey, and are in stock. White or grey is the new Satin Anodised Aluminium look.

Drawing and design work

Initial space needed work

Demountable Partitioning with Sound Performance

The solid walls also had a neutral colour wall covering applied to the plasterboard panel, but there are a wide variety of colours and patterns to choose from. If in any doubt it is safest to chose a neutral colour, and then the colour for the office can be brought out in the fabrics of the chairs and screens of the furniture.

Why Demountable Partitioning?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.
Categories
All Project Categories Suspended Ceilings

New Suspended Ceiling Installed over Christmas in Calne

Client: Calne Leisure Center
Value: £6k

We were contacted just before Christmas by a surveyor who asked for our help in fitting a suspended ceiling throughout Calne Leisure Center, the only problem was that it had to be at cost and carried out over the Christmas Break ready for opening in January.

The idea was that the people of Calne purchased the Leisure Center and so the work was carried out by local people.

Construction Photographs

Suspended Ceiling Projects

There are many different types of suspended ceilings and the range of tiles now can be quite baffling. The current trend is to focus on sound performance within the office and this can be dealt with by using a special tile.

Suspended ceilings are used for a number of reasons, they are quick to install and mean that all the services required for offices such as pipework for plumbing and air conditioning, as well as power and data can be hidden out of sight. Access to the services is also much easier than using a traditional plasterboard or MF type ceiling as the ceiling tiles just need to be lifted from the grid.

There are many offices with old fissured tiles, with sagging tiles and a mottled grey look they make the office look very dated. We like to fit nice white clean tiles to give a fresh look.

 If you want to improve sound performance for a space, or want to hide some services, or have any questions about suspended ceiling types please give us a call on 01380 73 88 44

Categories
All Project Categories Suspended Ceilings

Suspended Ceiling for Chippenham Motor Co

Client: Chippenham Motor Co
Value: £41k

The suspended ceiling for Chippenham Motor Co. was very complicated to achieve, particularly the upstairs profile where the customer required a vaulted roof line in two directions. Downstairs consisted of a series of 8 ceiling pockets formed by many bulkheads joining each other

Downstairs

The pockets had to be lined square to each other so that each ceiling set inside it looked square to the one either side of it in both directions. As we were aware of this, we ended up cladding the beams with fireline board so that we could angle them so that the sides were straight and parallel. If someone else would have done them, they would not have worried about the ceiling, and each pocket would then have angled cuts along each of the sides. Although this may appear trivial to many people and most fitters probably would not have worried about it, just clad the beams as quickly as possible and fitted the grid, then the customer would have got a poorer job. As it is the pockets are all square and you do not see any unsightly angles as Cre8tive takes a pride in making sure that things are carried out properly.

Upstairs

The upstairs ceiling was actually very complicated to do as the customer wanted to maximise the head room upstairs but it was not possible to raise it completely due to the edges of the building. We therefore set another ceiling higher, beyond the outer edges. The difficulty with this is in lining up all of the grids so that it would look right. In the time allocated to do the upstairs ceiling, a good 25% of the time nothing was actually built, the time was spent setting out the dimensions and working out all of the angles. As you can see we left some of the tiles out so that other services could be fitted, but if you are ever in Chippenham, please visit the Chippenham Motor Company and you will see what we mean. (They also sell cars).

Suspended Ceiling Requirements?

We have been supplying and fitting suspended ceiling systems as part of our main refurbishment projects for a number of years, if you are not sure on what can be done please give us a call, the more unusual and difficult the better.

Please give us a call on 01380 73 88 44.

Categories
All Project Categories Partitioning Suspended Ceilings

Office Fitting in Melksham on a Mezzanine Floor

Client: Coombe Castle
Value: £62k

Cre8tive was asked to help carry out an office fitting project for Coombe Castle,who were moving from Corsham to Melksham. The work on this started 6 months ago, once the customer had in mind what they wanted to do, Cre8tive carried out a detailed plan of the building. This involved taking accurate measurements of all of the inside and outside space, in particular determining where all of the cabling went.

Cre8tive then designed the position of the new canteen and offices that were required on the existing mezzanine floor. The only problem was that the roof height was over 4 meters high, and Building Regulations says that you have to have 1 hour fire separation between offices and warehouse, so we devised a specification to meet this.

Other requirements for office fitting included spaces that need ventilation and heating, so Cre8tive had to extended the existing heating system, and fit a VAM  unit within the ceiling void to take air from the outside to the inside.

The office fitting project included data cabling the existing offices as well as the new, providing all electrical, flooring, kitchen, decorations and suspended ceiling for the space.

Drawing and specification work.

We produced many drawings for each of the areas that we had to work on. This included work to the front offices, so they needed power and data, lighting, repairs to the suspended ceiling and new carpet. Other areas included:

  1. Repairing some of the panels in the toilets.
  2. Stripping out the existing kitchen and canteen, converting into a new Sales office.
  3. Providing all of the plumbing requirements for the clean room area downstairs.
  4. Building new offices and canteen on top of the mezzanine floor which had to meet building regulations.
  5. New heating and ventilation.
  6. New comms rack.
  7. Painting much of the outside block walls white.
  8. Building a couple of offices on the shop floor, again these had to be 1 hour fire rated.

Existing building photos before work

Construction photos

Completion photographs

Project Management..

We have many ideas on how to make the best use of space, and we are seeing offices and talking to customers all of the time. Over the years we have seen many projects and often have to work to a budget. What we do is get the space working right first and then focus on the budget. In this case the budget was very tight so we ended up using a very cheap carpet which did not affect the design of the office, and just brought it into the manageable level for the customer. This project was leased over 3 years. Please contact us for further information about leasing and financing.

01380 73 88 44 or email us at [email protected]

Categories
All Project Categories Suspended Ceilings

Suspended Ceiling and Partition Reconfiguration work in Trowbridge

Client: Zircon Software
Value: £23k

Suspended Ceiling and Alteration work

We completed this replacement suspended ceiling project for Zircon Software in Trowbridge who moved to new premises. The existing ceiling was very tired, so we produced a lighting scheme along with some drawings to present to the customer with the costing. We supplied new suspended ceilings and lighting throughout and also took out a couple of walls for them. The work carried out here is typical of what we call dilapidation work, in that the work is needed for someone moving in to be able to occupy it in a reasonable state.

Categories
All Project Categories Consult Install Office Refurbishments Partitioning

Office Fit Out British Nuclear Group in Bridgewater

Client: British Nuclear Group
Value: £99k

Cre8tive were contacted by an Office Furniture company as they were not able to deal with the office fit out side of the project for British Nuclear Group. The customer had already employed an architect to specify what was required and so it was really a case of demonstrating that we knew what we were doing and that could cost the project to meet the clients budget. This project took place on the ground floor of Mallard Court.

The project was designed by Oxford Architects who specified the partition system.

The project was a 6 week duration project which had to run under the Construction Design and Management regulations. Cre8tive Interiors acted as Principle Contractor on the project. The office fit out  for British Nuclear Group consisted of Komfort Double Glazed Polar Demountable Partition System, as well as single glazed Polar screens and Komfort Komfire 100 partitions. The project also included supplying and fitting of a kitchen from Howdens, new carpets, fitting of fire barriers in the ceiling and floor voids, and complete decoration of the workspace.

Initial design and drawing work

Initial site photographs before work

Construction Photographs

Working for the British Nuclear Group had it’s challenges. As you would expect every aspect of the work was scrutinized, we also had to have a permanent person on site all of the time which sometimes on projects like this we do not always need to have fitters doing work whilst other work is being done by others. BNG contracted their own duct work people, so they had to carry out some works when we had to be off site.

Completed Photographs

Why Demountable Partitioning?

This particular project had what we call demountable partitioning in it. Landlords insist on this type as it can be easily relocated without doing much damage to the building.

  1. Demountable partitioning is tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Need an Office Fitting out?

This particular project was driven by BNG with a design carried out by Oxford Architects. We were the contractor who completed the work. If you need any design work doing we can do this, as well as being the principle contractor for the work.

Any questions please do not hesitate to contact us on 01380 73 88 44 or email [email protected]

Categories
Air Conditioning All Project Categories Office Refurbishments

Office Refurbishment Project in Shepton Mallet

Client: Easynet Global Services
Value: £160k

Refurbishment

Cre8tive was asked to tender to carry out an office refurbishment in a 3 storey building in Shepton Mallet. Having successfully won the project, the next problem was how to carry out the work in a relatively short space of time, over the winter months with snow on the ground and no heating until the air conditioning was commissioned. The building was not a traditional office, in that there were no suspended ceilings (and not the height to fit any), and no raised floors, and the customer wanted lots of walls removed as well as fitting CAT6 cable into floor boxes in all of the floors.

All of the major elements that are used in a conventional office refurbishment were used, electrical work including data cabling, new lighting, reconfiguration of the power between floors, flooring using a rubber insulation floor to reduce sound transfer between floors, new air conditioning throughout, new kitchens on the floors including new appliances.

One of the difficulties was that the work had to be carried out in the winter months and without any heating until the air conditioning system was installed it was freezing on site. We had heaters but you cannot have the heaters on too much as it would dry out the plaster too quickly causing cracking. The paint also did not dry out properly so it just made the project much more difficult to complete. We also had snow to contend with and we lost several days as the guys could not get into work. We did finish the project a week early allowing the customer some more time on getting the IT equipment in.

Existing building photographs

Construction photographs

Office refurbishment

If you need any advice or are thinking of an office refurbishment project please give us a call, we would love to talk to you, on 01380 738844

Categories
All Project Categories Office Refurbishments Partitioning Storage Walls Suspended Ceilings Toilet Refurbishment

Head Office Design and Refurbishment Work

Client: De La Rue
Value: £200k

Office Refurbishment in Bath

The Administration Building looked very dated and did not represent the image De La Rue wanted to present to their customers. The building needed a thorough interior office refurbishment and design to create an environment in which staff feel empowered and involved and to portray the right professional image to visitors to reflect the high company values.

As the company uses wood pulp in the production of security papers, an earthy feel was required to the design. Due to the size of the project the work had to be carried out under the Construction Design and Management Regulations (CDM) which applies to any construction type work taking longer than 30 days or employing more than 5 people on site at any one time. Cre8tive was employed as a principle contractor, and the client employed a Heath and Safety Consultant to help run the project safely. The office refurbishment had a strict timetable of 8 weeks for completion.

Design Work

The design process took around 3 months. The initial proposal was made in competition with another company in which we were able to convince the customer that we had the skills to deliver, as well as come up with a good design. The first step is to measure everything and work out who does what where before moving onto the plan. We thought upstairs the best thing to do was to take out as much of the upstairs walls as possible to let as much natural light into the space. Unfortunately the walls upstairs held up the roof, so we had to employ a structural engineer to do some calculations and fit some steels to the beams. Downstairs also required opening out, and a beam had to be fitted downstairs.

Initial site photographs

Construction / demolition photographs

Office Refurbishment Project?

If you need some office design as you are unsure what to do Cre8tive can help, regardless of the size of the project we like to be Cre8tive with what we do with the space. As well as all of the practical things such as running the project as Principle Contractor, dealing with Health and Safety and running the project well we add something extra and that is the Cre8tive effect.

Please give us a call on 01380 73 88 44

Categories
All Project Categories Partitioning

Building an Office Partition on a Reception Desk

Client: Malmesbury Primary School
Value: £5.6k

This was a difficult problem to solve and the only way we could think of doing this was to actually construct a glass partition onto the reception desk. The school had a specific issue with noise coming into the office area as the reception desk is in a main traffic area. Draught’s were also a problem as well as some of the electrical control equipment including the CCTV system was spread over a large area. A new cabinet was supplied under the desk with all the cables re-routed to suit. It was also important to keep the costs to minimum so various options were considered before work started.

In addition to the above, the school wanted some degree of sound insulation. Their initial thought was that the desk would have to be rebuilt with some form of new partition built and all of the computing equipment behind the desk would have to be moved. The CCTV and security systems would also have to be disconnected so a real nuisance. I did think that the desk that was there was pretty good and we could keep it in place, why get rid of it. The idea then was to build something on top of it. The complicated section was on the raised section, a normal partition system would have very chunky frames, so we chose a silicon jointed glass system that would be ready neat and tidy. The joins of the glass could then be angled and ground, then seal with a silicon seal without any vertical aluminum uprights that you would normally use on a conventional partition system.

A further requirement was that they wanted a sliding hatch arrangement so they could open and shut glass doors as needed and we could build this in a partition.

Construction photos

Timing was important as with a busy school and the reception desk being situated in the main thoroughfare, we had to build the partitions out of school hours for safety. The first section to build was the more conventional sliding frame hatch using a conventional partition system but using special ‘Chas mood’ sliding door gear within the partition frames. Once the sliding hatch was built, the glazed system was constructed across the desk. Once all of the frames were built the glaziers arrived to fit the glass.

Completed photos

We did use two different proprietary demountable partitioning systems to provide the finish result. There are several good reasons to use this type of system, the main one is that it can be taken down and removed quite easily. The words demountable partitioning are used quite often in our fit out and refurbishment projects.

Summary on Demountable Partitioning

  1. Using Demountable Partitioning is very tax efficient as they are seen as movable items and so can be treated differently in writing down allowances in the accounts. We have a better description on our News / Blog page on this site.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on Demountable Partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Questions on extending offices?

If you are not sure about anything as well as taking about all kinds of partitioning including Demountable we love to talk about projects and sort out problems and issues with space, please give us a call on 01380 738844

Categories
All Project Categories Design Office Refurbishments

Refurbishment Projects in Bristol- Innovations Centre

Client: Smurfit Kappa
Value: £118k

Office Refurbishment Projects

We have carried out several refurbishment projects for Smurfit Kappa over the years and the customer had every confidence that we could deliver. The project had to be run under the Construction Design and Management Regulations (CDM) due to the time on site, and the number of fixers on site as well. Please click the link to go the page which explains more about CDM.

The office refurbishment project was made more complicated as the main staircase had to made available whilst the work was carried out, so planning and carrying out the appropriate risk assessments was important.

Office Refurbishment Scope of Work

The work included:

  • Initial project brief
  • Development of ideas with the customer
  • Drawings, designs, 3d visuals
  • Costing
  • Liaising with on-site Health and Safety advisors, production of Health and Safety Plan.
  • Running the project under CDM
  • Completion on time within budget

Supply and fit of: stripping out, electrical work, flooring, lighting design, office furniture, design of colours and specification of finishes, air conditioning, decoration and construction of a curved presentation wall and fitting the customers own artwork.

Initial photographs of existing space

This was essential to try and work out what we were dealing with. The constraints as well had to be considered which mainly revolved around agreeing access times to get materials up and down the main staircase. First task is always to take loads of photos, measurement, then to go away and think about it.

Initial Designs

The first step in any office refurbishment projects that needs design is to work out the basic space plan first, once this was done we produced a series of the 3d visuals to help the client understand what the space may look like, and use this tool to further refine and ensure that the customer will get exactly what they want.

Detailed drawings

Once the design was approved the next task was to detail up the drawings to ensure that we produced exactly what the customer wanted. The table for the downstairs meeting room was made to a Smurfit Kappa specification and design. We had to squeeze it in to the space however which was a bit difficult.

Construction Photographs.

One of the tricky things to do was to actually get to the height of the roof using mobile towers. The insulation had to be tacked in place so it did not slip down the roof, everything boarded, tape and jointed then painted, all working 5 meters off the floor.

There are so many awkward angles, it is hard to show with photographs the geometry of everything.

Final Photographs

The final result was a mixture between the original design that we did and adjustments made by the client. The actual box wall itself was made by the customer as this is what they do, construct things in cardboard. We had to give them the curve and they did the rest. Overall the customer was very happy with the result

Similar Project?

Although it is very unlikely that we will ever come across a project exactly the same, the same basic principles in what we do are carried through all projects.

If you are stuck for ideas but know that something needs to be done, please give us a call on 01380 73 88 44 or email us at [email protected]