Client: Mango Solutions
Value: £3.5k

Mango Solutions contacted us to build a new demountable office partition to be built onto the existing system which we installed originally many years ago. One of the offices needed to act as a server room and so had to be 30 minute fire rated, the other room had to be a small meeting room with two glazed front panels, with integral blinds. The demountable office partition system also had to match the existing system that we constructed a few months ago for another area of the office.

The difficultly with this project was the the ceiling is sloped and the door had to be constructed at a 45 degree angle making the ceiling joint difficult to construct. The system used was a 75mm wide demountable partition system offering good sound performance.

Why Demountable Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitions is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.
Categories
All Project Categories Dilapidation work Mezzanine Floors Office Refurbishments

Office and Factory Refurbishment in Chippenham

Client: Image Factory
Value: £350k

Office and Factory Refurbishment project

This customer wanted a Factory Refurbishment having taken on the old Royal Mail building in Chippenham.

The first photograph below shows a £1m printing machine and Image Factory invested in two of them, along with taking over the old NHS distribution building on Bumpers Farm Industrial Estate. The complete building had to be refurbished, so the main factory along with the offices along the front of the building.

Factory Refurbishment

A large part of this project was electrical. The main factory had no power infra struture at all to power all of the print machines that the Image Factory owned as well as the new ones; so we had to install a heavy power buzz bar system into the factory and prepare the base and ground works for a new substation to be fitted.

In the main factory the floor had to be scrabbled to remove old oils in the concrete floor and then a high quality epoxy paint applied to the floor. All of the beams, walls and other surfaces also had to be painted.

Factory Refurbishment Photographs

Office Refurbishment

As well as the factory itself, the offices at the front of the building had to be completely stripped out and refurbished.

The mezzanine floor had to be turned around and a new jumbo stud fire wall constructed. Below the mezzanine floor we created a new reception area with fire rated ceiling, decorations and flooring. Upstairs included new ceilings, carpets, plastering and decorations as well as a new kitchen. Also fitted upstairs was a new office constructed from Komfort Kameo 75mm demountable partition.

If you need any advice or are thinking of an office refurbishment project please give us a call, we would love to talk to you, on 01380 738844

Categories
All Project Categories Partitioning Projects Uncategorized

Take Down and Rebuild Partitions in Bracknell

Client: EB Mind Bracknell
Value: £1.8k

Take down and rebuild is a common activity with demountable partitioning. The existing office space was very small and as well as re-positioning a door, we had to build a new office in the opposite corner to match the existing design and colour scheme. The first task was to draw what they had, so measure everything, take lots of photographs, look at what the wanted to do, and then work out how many bits we create by talking the walls down, and then work out how many new parts we need in order to create the new. The system used in this project is a 50mm wide demountable partition system, offering a good value product which visually can still look good. In this case the partitions had to match the existing, but all of the frames and solid panels can be made from a wide range of colours and finishes.

This project is exactly a take down and rebuild project, but with a bit more added. Although this sounds complicated, it is exactly what demountable partitioning is designed to be, you do need not destroy the partition when you take it down, as you can re-use most of the parts. The only provision is that the re-built demountable partition needs to be in the same area with the same ceiling height.

Completed Photographs

Why Demountable Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts. Please click this link for a bit more information we have written in a blog.
  2. We can also lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitions is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.
Categories
All Project Categories Projects Suspended Ceilings

Suspended Ceiling at Height in a Squash Court

Client: DJ Kelly Homes
Value: £3k

Suspended Ceiling

The difficulty with this suspended ceiling project was that all of the work had to be carried out off two mobile towers as the ceiling was for a squash court. The tiles had to be plasterboard tiles for robustness, and the tiles had to be clipped into the grid so that they did not move. The grid was also suspended from rigid hangers rather than wire to make the ceiling as rigid as possible. Many people think that anyone can put up a suspended ceiling but there are only a few that can do it properly, we see many suspended ceiling projects which have sagged and you can see dips in the ceiling.

We fit all our suspended ceilings in with a laser, so the surface is completely flat. We also give advice on certain types of tiles as you can fit a cheap ceiling but the actual tile may not be correct application. In this case a standard mineral fiber tile would not have lasted, and as the squash court was in an outbuilding, there was a chance of moisture getting into the tiles. As soon as moisture gets into the fibers the tile will sag and you will see shadows on the corners of the tiles.

The other problem was that it was a bit dark initially as we were waiting for some temporary lights to be delivered.

Suspended Ceiling Construction Photos

Suspended Ceiling Projects

There are many different types of suspended ceilings and the range of tiles now can be quite baffling. The current trend is to focus on sound performance within the office and this can be dealt with by using a special tile.

Suspended ceilings are used for a number of reasons, they are quick to install and mean that all the services required for offices such as pipework for plumbing and air conditioning, as well as power and data can be hidden out of sight. Access to the services is also much easier than using a traditional plasterboard or MF type ceiling as the ceiling tiles just need to be lifted from the grid.

There are many offices with old fissured tiles, with sagging tiles and a mottled grey look they make the office look very dated. We like to fit nice white clean tiles to give a fresh look.

If you want to improve sound performance for a space, or want to hide some services, or have any questions about suspended ceiling types please give us a call on 01380 73 88 44

Categories
Air Conditioning All Project Categories Design Office Furniture Office Refurbishments Partitioning Projects

First Floor Office Refurbishment in Bath

Client: Regency Laundry
Value: £28k

Cre8tive have carried out many office refurbishments over the years and all need to have some design and drawing work done initially and is the most important aspect of a project that needs to be  carried out in order to carry out a project properly. The existing office space had small narrow corridors, a dated partitions system and dark green colours making the space very dark.

We redesigned the office space and used beam system furniture to get computer cables off the floor. We also created a tea point in a cupboard and added some features in the carpet for some added interest in the design. All of the walls had to be redecorated. The refurbishment project consisted of Komfort Kameo 75mm demountable partition system, Gaskell carpet tiles, Armstrong suspended ceiling and Sebastien Indulgence furniture.

Included:

  • Design and drawing work
  • Stripping out of existing
  • Demountable Partitioning
  • Electrical work
  • Air conditioning
  • Flooring
  • Kitchen / tea point
  • Office Furniture

Drawing and Design Work

Working out what the customer wanted meant we had to drawer what they had and come up with several layouts to explore how the office would work for them.

Office Refurbishment Construction Images

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure what to do?

  1. Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.01380 73 88 44
Categories
All Project Categories Office Furniture Office Refurbishments Partitioning Projects Storage Walls

Office Design and fit out in Chippenham

Client: Redlynch Leisure
Value: £27k

Office Refurbishment in Chippenham

Redlynch Leisure wanted to have a new open plan space to have an office design and fit out carried out. The initial space was completely empty and required a complete design with fitting out work, consisting of Interior space planning and design, demountable partitions, storage wall, carpets, creation of canteen area, flooring, decoration and minor electrical work. We also supplied all of the office furniture which was in keeping with the design of the building.

Design and drawing work

We came up with a few different ideas, the customer in the end went for a more traditional layout.

The office design and fit out project also required us to submit plans to Building Control for approval which we obtained on behalf of the client. The major aspects of this office refurbishment project is in using materials which were complimentary to the design of the building. We chose Komfort Klassic timber demountable system which matched the finish of the barn styled windows. The storage wall was chosen to take the place of a partition wall and a cupboard, saving on cost, and fitting with the finishes of the partitions, outside of building and the furniture, which we also supplied and installed. We also had to alter the plumbing and move a radiator in order to install the partitioning. We provided a complete package and all the customer had to do was to move in.

We also put the customer in touch with an IT company and telephone systems company to handle the requirements which we work closely with in projects.

Storage Wall

We designed into this project a product called storage wall. Storage wall combines the function of a cupboard with a partition wall. So we build it up to the ceiling and as the width is around 400mm the thickness of the wall with the contents gives really good sound insulation. It is still demountable, so can be taken down and rebuilt.

Why Demountable Partitioning?

Another key element of this work was that the partitions had to be demountable. There are several reasons why this type of partition should be used in office projects:

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.
Categories
Air Conditioning All Project Categories Office Refurbishments Partitioning Suspended Ceilings

Office Refurbishment in Weston Super Mare

Client: John Hodge Solicitors
Value: 75k

An office refurbishment in Weston Super Mare was requested by John Hodge Solicitors. They had recently purchased a video store just out of the town center. At the same time they purchased another building at Morston Court, separate project. This building was the customer facing part of the business so the old store needed to represent the corporate identity but also be practical.

One of the first problems was that the whole internal space needed stripping out. They also needed a reception areas, some client meeting rooms near the reception and an admin area close by. Upstairs there was also a requirement for office space.

As the building use was going to be for public access, see clients from the general public, disabled access doors and a disabled toilet needed to be considered, as well as the car park out the front, with a slope, handrail and markings.

Initial site Photographs

Drawings and design work.

Construction photographs

Car park and Front

.

Completion photos

.

Office Refurbishment Project?

We would love to talk to you. We get a real kick of seeing some really run down properties, working out what can be done with a vision, carry out the work to transform the property.

If you have a similar property, or want to try and re-work your offices  then please do not hesitate to contact us.

01380 73 88 44 or email at [email protected]

Categories
All Project Categories Office Refurbishments Partitioning Projects

50mm wide Glazed Partitioning in Swindon

Client: Scots of Stow
Value: £3.9k

50mm wide Demountable Partitioning

50mm wide glazed office partitioning was the obvious solution to the customers requirements. The customer wanted some demountable partitioning to turn and unused office space into an open plan office space and a directors office. The system we recommended  was a 50mm wide glazed demountable system from Komfort that included a lot of glazed walls to allow light through and keep the area open and bright.

Privacy was a factor; the customer wanted each office and the meeting rooms to be private as possible. we used a wider 75mm system on the adjoining walls, and integral blinds in the glazed partitions so each office and meeting room could be enclosed when they needed. The walls were finished in a pale gray vinyl and the doors in a nice beech veneer to add some colour.

.

Existing open space

Drawing and planning work

Always important to measure what we have, by laying out where the partitions were needed, straight away we could see that the lights needed to be moved.

Construction and final photographs

Need any office partitioning?

Offices require demountable partitioning. As well as looking better than traditional stud and plasterboard there is a financial advantage as well. Please refer to our post Why use demountable partitioning?

Please give us a call on 01380 738844 or email us at [email protected]

Categories
All Project Categories Office Refurbishments Partitioning

Creating a New Office Space in an Industrial Unit in Trowbridge

Client: Office Evolution
Value: £13k

Office Refurbishment

This customer purchased an industrial unit that was fitted in a way that was not really suitable for them as they needed to use it for offices. The whole space needed an office refurbishment with most things needing to be done. Creating a professional atmosphere was important as the customer wanted to use the office as a showroom as well.

They also wanted a double door to the garage area so that this could act as a store and a suspended ceiling throughout, and to make the space light and airy we used Cat2 lighting throughout.The project included a small bit of stripping out, new kitchen, redecoration, electrical power and data, new demountable partitions, new suspended ceiling and lighting and a new carpet.

Office Refurbishment Construction Photographs

Why Demountable Partitions in an Office Refurbishment?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved we can lease.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Not sure about what to do?

If you need help with anything and are not sure what to do, please give us a call for a chat and a visit. We are happy to carry out as much or as little as you require and can come up with solutions to any problems or queries you have about an office refurbishment project.
Please call 01380 73 88 44

Want to find out more about our customer?

Please click this link to go to their website..

Categories
All Project Categories Storage Walls

Floor to Ceiling Storage Wall in Swindon to save on space.

Client: APS Mortgages
Value: £12.5k

Based in Edison Park in Swindon APS Mortgages were very active in the sub prime mortgages market. Although no longer about we carried out some nice projects for them.

The requirement for this project was to subdivide the office space with some partitions, and provide a line of storage for archive files. We therefore selected storage wall which is a full height built in wall that is also a cupboard saving on the overall costs of purchasing walls and cupboards separately.

The back wall of the storage wall in the canteen also had veneered panels matching the front, and the storage is fully floor to ceiling maximising the use of space. Unfortunately we do not have any construction photographs for this project. Internally there is great flexibility on what you can have inside. We can build an audio – visual suite, with room for a TV, and presentation equipment such as white boards and flip charts. The shelves inside can be configured so that you can have the lower sections as pull out frames to accommodate conventional files that you would normally have in a filing cabinet. Special shelves are made that a called combination shelves, as the return lip underneath allows you to hook suspension files laterally. This method of storing files is much more efficient than conventional filing cabinet storage.

What is a Storage Wall?

As mentioned in the text above we designed into this project a product called storage wall. Storage wall combines the function of a cupboard with a partition wall. So we build it up to the ceiling and as the width is around 400mm the thickness of the wall with the contents gives really good sound insulation. It is still demountable, so can be taken down and rebuilt.

Storage wall
Room divider

Not sure what a storage wall can do for you?

We have been supplying and fitting storage wall systems as part of our main refurbishment projects for a number of years, if you are unsure about anything please give us a call.

Please give us a call on 01380 73 88 44.