Categories
All Project Categories Suspended Ceilings Toilet Refurbishment

Small Suspended Ceiling areas in Chippenham

Client: EJS Chippenham
Value: £2.5k

This project involved replacing an existing suspended ceiling in Chippenham. There were several ares to look at including a reception area, as well as supplying and fitting a new grid and tile ceiling for the shower room and toilets. As always the toilet areas take a long time as there are lots of small tile cuts to do as well as forming a bulkhead between some of the areas.

Existing pictures

Construction photos and Finished result

Suspended ceiling problems?

There are many different types of suspended ceilings and the range of tiles now can be quite baffling. The current trend is to focus on sound performance within the office and this can be dealt with by using a special tile.

Suspended ceilings are used for a number of reasons, they are quick to install and mean that all the services required for offices such as pipework for plumbing and air conditioning, as well as power and data can be hidden out of sight. Access to the services is also much easier than using a traditional plasterboard or MF type ceiling as the ceiling tiles just need to be lifted from the grid.

There are many offices with old fissured tiles, with sagging tiles and a mottled grey look they make the office look very dated. We like to fit nice white clean tiles to give a fresh look.

We have been supplying and fitting suspended ceiling systems as part of our main refurbishment projects for a number of years, if you are not sure on what can be done please give us a call.

Please give us a call on 01380 73 88 44.

Categories
All Project Categories Suspended Ceilings

Very Large Suspended Ceiling Project in a Warehouse

Client: Connaught
Value: £35k

Suspended Ceiling

This suspended ceiling project involved two buildings, one very large area and the photograph above showing the front offices. The suspended ceilings were part of a main factory refurbishment project for one of their clients. Working for a Main Contactor meant we had to fit our schedule in with other trades which is always difficult without having tight control on site with every aspect of the project.

Existing photographs

The pictures below show the state of the place when we first looked at it. A considerable amount of debris was on the floors and the main contractor was in the process of dismantling everything and clearing away the site.

Suspended Ceiling Construction photographs

Note the fire barrier that we had to install half way down the building.

We did give some advice on the selection of the tile, as the one that was specified was very expensive, and so we chose an alternative which was not much cheaper on the cost per square meter, but on 1200 square meters it made a difference to the customer.  Other areas such as stair wells and the entrance used an MF ceiling construction which is metal framework construction with plasterboard screwed to the frame, taped and jointed and then decorated in a neutral colour.

Suspended ceiling problems?

There are many types of suspended ceilings available, please click this link for more information. We have been supplying and fitting suspended ceiling systems as part of our main refurbishment projects for a number of years, if you are not sure on what can be done please give us a call.Please give us a call on 01380 73 88 44.

Categories
Air Conditioning All Project Categories Office Refurbishments Suspended Ceilings

Wall Removal to Enlarge and Refurbish an Office Space

Client: Kingsley Pike Estate Agents
Value: £13k

This Design and Refurbishment project including supplying and fitting two steel beams to support the three floors above the shop, and to remove a structural wall and so needed some design work in order to carry out the refurbishment of the space.

The effective use of space was very difficult to achieve due to the small space in the office, however we still had to produce drawings to satisfy Building Control and to determine exact positions of voice, data and lighting positions. The project included electrical work, decorations, air conditioning, construction of step, flooring, lighting design and carrying out the work in 7 days. We had to carry out a complete design and refurbishment of the existing space.1703 kingsley pike 11-10-05-Model

Design and Refurbishment work

We spent some time working out what was needed in the space and what we could get in. The beam was calculated, as the back wall to the shop needed to come out to widen the office space, the issue was that the wall held up the 3 floors above. One of the main problems was that the main beam was 6 meters long and it took 4 people to lift it into the shop from the main high street. The delivery vehicle had to leave the beams on the pavement whilst everything was prepared.

Construction Photographs

Completion photographs.

General Refurbishment and Fit out Work

If you need any advice or are thinking of an office refurbishment project please give us a call, we would love to talk to you, on 01380 738844

Categories
All Project Categories Mezzanine Floors Office Refurbishments Partitioning Suspended Ceilings

Office Expansion in Corsham for Coombe Castle

Client: Coombe Castle
Value: £48k

Office Expansion in Corsham

This project consisted of converting a storage unit in to office space in order to provide some much needed office expansion. The project would involve fire protecting a mezzanine floor as this is required by Building Regulations if you have offices above, steel work and a suspended ceiling.  Ventilation had to be put round a chiller and fire sensors had to be installed within the chiller as it could not be moved to fit the fire protected board. Office windows had to be installed to match the rest of the building.

Upstairs needed a complete office fitting, so a suspended ceiling, dry lining the outer walls, decoration of the outer walls,  some fire rated partitioning to create a fire barrier between the offices and warehouse, as well as demountable partitioning within. Full electrical work including CAT2 lighting, 3 compartment perimeter trunking, flooring and new windows were also required. As always we follow our process, so the first step is to understand what the client wants, and then to assess what they have by taking photographs, and drawing everything.

Existing Space Photographs

It is a bit difficult to see from the photos, but essentially we had several areas to deal with. Underneath the mezzanine and on top of it was the main area, but included absolutely everything we do.

Building Regulations

It is crucial to consider Building Regulations when looking at layouts for offices. In particular fire ratings and Building Regulations which is a legal requirement. This particular project needed offices to be fitted on top of a mezzanine floor and so this is why it had to comply to the law.

If you need more information about Building Regulations, we have written a few things here.

Construction and finished photographs.

Office Expansion?

If you have a problem with your existing office space and need it altering as you are running out of space then Cre8tive can help. Please give us a call on 01380 738844.

Categories
All Project Categories Partitioning

High Wall Jumbo Stud Office Partitioning in Bristol

Client: Bristol Language Centre
Value: £16.5k

Jumbo Stud Partitioning

The client was expanding to a new floor in the same building and was in need of jumbo stud partitioning as well as standard stud partitioning for seven new classrooms. The client decided against a suspended ceiling, instead having the rooms reach up to the apex of the roof at 4.5m. We felt that this would increase the noise levels in the room but the benefit would be a much more open environment.

We had to work out the materials in order to cost the work, so the first job is always to measure and draw it.

Jumbo stud wall for Bristol Language Center Bristol
A drawing is needed to work out how to do things.

The walls were constructed from stud and board with jumbo stud to achieve a strong structure to that height. The walls were taped and jointed and painted in an off white colour so that each room was kept light and airy. The front doors to the training rooms were constructed from some conventional demountable partitioning system materials, as well as some demountable partitioning skirting sections to run around the walls.

Existing photographs

Construction photographs

As explained in the previous paragraphs this project used jumbo stud partitioning due to the height requirements of the wall, most walls in offices use demountable partition for speed of construction as well as other uses.

Why Demountable Partitioning?

  1. Demountable partitioning is tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Questions on any  kind of Partitioning?

If you are not sure about anything we love to talk about projects and sort out problems and issues with space, please give us a call on 01380 738844

Categories
All Project Categories Suspended Ceilings

Suspended Ceiling in Melksham sub station

Client: Melksham Sub Station
Value: £4k

We were called in to look at Melksham sub stations‘ meeting room and staff room as there were a few problems with the inside of the room. The existing ceiling at the sub station was just exposed to the roof. As well as looking unsightly, the rooms were generally noisy as any sound bounced off the hard surfaces of the roof without being absorbed. The sub station also lost heat through the roof space, so the requirement was to install a new ceiling in a couple of rooms which would solve these issues. Instead of the usual CAT2 louvred lighting we fitted LG3 indirect/direct fittings which reduce any shadow around the edge of the room. A suspended ceiling was the obvious answer.

Choosing the right suspended ceiling tile is important to get the right balance between how the ceiling will look, its performance, (often related to sound and insulation), and of course cost. Cre8tive usually presents some options with some recommendations which then the customer can chose the right combinations to the budget that is available. In this instance we did not believe in presenting the cheapest tile for the cheapest price, which is what many companies do, but for not very much more they got a massively different look to the ceiling. The client also spent a bit more money in getting the correct lighting sorted and ended up with exactly what they wanted.

Construction and finished photographs

Not sure what Suspended Ceiling to have?

There are many different types of suspended ceilings, and we have selected a good quality plain faced tile in this case, which will not bow if it gets a bit of moisture, and is nice a bright. The lighting was important, as traditional CAT2 lighting creates shadows around the walls, we chose LG3 which throws light back into the diffuser producing less shadows around the edges of the walls.

There are many different types of suspended ceilings and the range of tiles now can be quite baffling. The current trend is to focus on sound performance within the office and this can be dealt with by using a special tile.

Suspended ceilings are used for a number of reasons, they are quick to install and mean that all the services required for offices such as pipework for plumbing and air conditioning, as well as power and data can be hidden out of sight. Access to the services is also much easier than using a traditional plasterboard or MF type ceiling as the ceiling tiles just need to be lifted from the grid.

There are many offices with old fissured tiles, with sagging tiles and a mottled grey look they make the office look very dated. We like to fit nice white clean tiles to give a fresh look.

If you want to improve sound performance for a space, or want to hide some services, or have any questions about suspended ceiling types please give us a call on 01380 73 88 44

Categories
Air Conditioning All Project Categories Design Office Refurbishments Partitioning Suspended Ceilings

Complete Office Design and Refurbishment

Client: Thales Optronics
Value: £55k

Cre8tive Interiors were ask to look at the complete office design and refurbishment for Thales Optronics in Taunton, to convert an existing factory area into a new reception area. Initial work required the removal of a metal skinned demountable system, ceilings and lighting, along with stripping out and replacing the entrance doors with new glass doors.

The lighting chosen was LG3 direct / indirect fittings which is the recommend lighting systems for modern offices. The partitions included silicon jointed glass called Komfort Polar, joining into Komfort Kameo 75mm system which offers a soft radius profile and joins neatly with the Polar silicon jointed system. The doors are disable access width to conform to the DDA regulations.

Existing Space

Thales did not use this building and wanted to create more of a main reception for the site. The building inside was very factory looking, in that it had metal partitions. Fine for a laboratory environment, not very nice for offices. The lighting was also pretty bad with old lino, the whole area needed replacing.

Drawing and Design work

Construction work

Final Photographs

Design and Refurbishment Work

Often with these projects the hard part is knowing where to start. The customer knows it is not right and may have seen other areas that they like. Translating that into a cost can be quite difficult, so what we do at Cre8tive is to listen and then try and interpret what the customer wants. We go through certain steps and doing the drawing work is one of them.

If you are struggling to come up with something, please do not hesitate to give us a call 01380 73 88 44 or email us on [email protected]

Categories
All Project Categories Office Furniture Office Refurbishments

Enhancing First Impressions: A Reception Area Redesign Project

Client: Smurfit Kappa
Value: £49k

We have been working with the customer over a number of years and they wanted us to come up with some ideas on how to deal with the customer interface into the factory. The brief was to redesign carry out a reception refurbishment to represent a modern clean and welcoming customer entrance into the building.

The total open area was vast, dominated by an open egg crate ceiling, dull lighting, brick walls with a dark oppressive atmosphere, and a dated looking ceramic tiled floor with a mosaic of colours pinks and dark greens. The reception office was situated in a brick built room at the far end of the open foyer area.

What we did was to look at the area that was important and that is the meet and greet to potential customers and suppliers by the entrance doors, and guiding important visitors into the main boardroom upstairs, or the CEO’s offices which were situated just off the main entrance doors.

We therefore came up with the idea of bringing the whole reception area towards the main entrance doors and just focusing on this area. We would then leave the majority of the area behind a glass wall alone and focus on the main lobby. By doing this, it also meant that we could meet the customers budget. It would simply cost too much to deal with the whole area.

Existing customer experience into Reception

Reception Refurbishment construction photographs

CDM and Health and Safety

The duration of the project and the number of people on site, as well as the access issues meant that we had to employ a Heath and Safety consultant to carry out a risk assessment and discuss with the client safe fire exit routes and means of protection from the staff whilst we were doing the work.

Reception Refurbishment Projects

If you would like us to look at your reception area, or indeed any aspect of your offices, please give us a call just for an initial no obligation discussion about what we may be able to do. We love to talk about projects.

Please call us on 01380 73 88 44

Categories
Air Conditioning All Project Categories Mezzanine Floors Office Refurbishments Partitioning Suspended Ceilings Toilet Refurbishment

Office Refurbishment with a Mezzanine Floor in Gloucester

Client: Scott Law
Value: £160k

Mezzanine Floor installation

Cre8tive Interiors completed an office refurbishment fit out project in Gloucester. The original building consisted of an occupied warehouse with a split level floor and block walls which needed to be converted to offices. We are calling this project a refurbishment project, it involved taking an industrial unit and changing it (refurbishing it?), and then fitting out the inside to provide a complete office space by fitting a mezzanine floor inside. So it is probably a mixture between a refurbishment project and a fit out project.

The offices had to include toilets, reception area, new staircase, kitchen, boardroom and further offices as well as full integration of electrics, data and air conditioning. The project was also run under the Construction Design and Management regulations, so adherence to Health and Safety was paramount. All activities had to have risk assessments carried out as well as method statements for the type of work. Cre8tive was also Principle Contractor for the work, and this meant that there were some things that the client wanted to do within the time frame on site which we managed to do.

Pre-construction Photographs

All of the internal walls, ceilings, toilets and electrics would have to be stripped out including the spiral staircase and small room above it. The two units had a gap inside joining them which would need to be blocked up. The block walls inside would have to be modified. In the end it was easiest just to rip it all out and start again.

Construction Work

The following photographs show the stripping out as well as the construction and finished photographs. The photographs show the sequence of events and all of the work that goes into creating offices over a mezzanine floor. Complete network cabling, power and data, heating and cooling with air conditioning, flooring, external windows, there are many things to manage and get to work properly which is what we do at Cre8tive.

We used demountable partitioning for the offices upstairs and downstairs for a few reasons, the first is that is is easy to reconfigure if you want to change it, and one of the other main benefits is that it can be leased and treated as a ‘moveable item’ as well as the mezzanine floor. The mezzanine floor itself is fully self supporting and not fixed to the fabric of the building so is also ‘demountable’. It could be unbolted and then re bolted in the car park outside if needed.

Why Demountable Partitioning?

  1. Demountable partitioning is tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Office Refurbishment

This particular project was more complicated that many that we do in that it involved the mezzanine floor. If you need any advice or are thinking of an office refurbishment project please give us a call, we would love to talk to you, on 01380 738844

Categories
Air Conditioning All Project Categories Office Furniture Office Refurbishments Partitioning Suspended Ceilings Visuals

Complete Design and Refurbishment in Bristol

Client: Smufit Kappa
Value:£75k

Office Design and Refurbishment

A complete office design and refurbishment project was required, involving initial space planning and design, through to stripping out and refurbishing the office space.

The existing space had a problem with an existing pillar which could not be moved and it was in the middle of the space, so we made a feature of it. We constructed a curved wall around the pillar. The project included: plastering, decorations, air conditioning, flooring, lighting, new suspended ceiling, demountable partitioning, the design and build of a specially sized conference table with pop up modules in the desk to connect a laptop to for presentations. The project also included the supply and installation of office furniture fully co-ordinated with the colour scheme. We also produced some visuals which allowed the customer to appreciate the colour choices.

Design Work

Once we have looked at the current space and taken a brief from the customer, then we draw it. We use Autocad, and we first have to identify exactly what is in the current space which will include the existing lighting, electrical and air conditioning aspects, as well as the walls and other items in the space. In coming up with a new design we first look to see what the customer wants and then try to squeeze it in. In this case we had a pillar in the way, so we made a feature of the pillar in the design. We always draw technical drawings which allows our suppliers to cost items, but sometimes customers can’t visualise what something may look like. We therefore organise some visuals to be produced which help the whole process in getting the project approved.

Visuals

We appreciate that we still carry out visuals by hand and some may say that computer generated visuals are better. However we like to have another perspective on the design and so these are carried out by another company. The visuals are hand drawn and then painted or coloured in and it is a final check that we are happy with the design.

Existing Space Photographs

Stripping out Work

Finished Results

The most pleasing aspect of this project is that we identified a major issue with the layout and as we could not move it, created a feature of it. The pillar ended up being the focal point of the space where the directors could display some of their samples.

Do you have something similar and need help?

Often with these projects the hard part is knowing where to start. In particular with this project the space was really awkward. The directors knew that something had to be done as it was so dull but we are a loss on what to do.

Translating ideas into a cost can be quite difficult, so what we do at Cre8tive is to listen and then try and interpret what the customer wants. We go through certain steps and doing the drawing work is one of them.

If you are struggling to come up with something, please do not hesitate to give us a call 01380 73 88 44 or email us on [email protected]