Completely New Design of the Existing Office Space in Bristol

Client: Smurfit Kappa
Value: £65k

Office Design and Refurbishment in Bristol

Our client wanted a complete redesign refurbishment of the existing office space. The first task was to come up with some ideas and some colour schemes, the director wanted an adventurous new scheme, so we focused upon creating a more spacious effect through introducing new concepts of Lighting, Suspended Ceiling, Partitioning, new Air Conditioning systems, Flooring and Furniture in order to create a more relaxed office environment that mixes bold contemporary colour and natural materials.

Design and Drawing work

In working out what needs to be done, we need to know what is there. A detailed drawing showing positions of electrics and the walls was produced. The new layout required a few designs, and in particular the Director wanted to have a meeting end on his new desk, so we had to design a desk and get it made particularly for him.

Colour scheme / Design

As this area was a completely separate area from the upstairs directors suite, we thought that the whole scheme could be different. The room was completely separate from the rest of the building, so when you walked in, there was a different feel which was modern, had a blend of the traditional timber partitions, along with some stripy carpet, and the middle solid carpet was a very high quality cut pile carpet which felt soft and luxurious underfoot. One of the main requirements was that the Managing Director wanted a meeting end on his desk and it was not possible to get one to fit from standard product ranges. We therefore had to get one made..

Existing space

As you can see from the photographs the whole area needed completely stripping out and replacing.

Stripping out and building photographs

I always like this phase as the office transforms, from a very dull space to something new. We do get an immense level of satisfaction in carrying out office refurbishment projects for this reason.

Final photographs

As you can see from the final photographs, Cre8tive were successful in carrying out a complete redesign and office refurbishment of the customers existing space.

Why Demountable Office Partitions?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

.

Not sure what to do?

Please give us a call and we can help with any aspect of interior office fit out, along with space planning and design work.

01380 73 88 44

Categories
Air Conditioning All Project Categories Office Refurbishments Partitioning Suspended Ceilings

Office Refurbishment in Weston Super Mare

Client: John Hodge Solicitors
Value: 75k

An office refurbishment in Weston Super Mare was requested by John Hodge Solicitors. They had recently purchased a video store just out of the town center. At the same time they purchased another building at Morston Court, separate project. This building was the customer facing part of the business so the old store needed to represent the corporate identity but also be practical.

One of the first problems was that the whole internal space needed stripping out. They also needed a reception areas, some client meeting rooms near the reception and an admin area close by. Upstairs there was also a requirement for office space.

As the building use was going to be for public access, see clients from the general public, disabled access doors and a disabled toilet needed to be considered, as well as the car park out the front, with a slope, handrail and markings.

Initial site Photographs

Drawings and design work.

Construction photographs

Car park and Front

.

Completion photos

.

Office Refurbishment Project?

We would love to talk to you. We get a real kick of seeing some really run down properties, working out what can be done with a vision, carry out the work to transform the property.

If you have a similar property, or want to try and re-work your offices  then please do not hesitate to contact us.

01380 73 88 44 or email at [email protected]

Categories
Air Conditioning All Project Categories Design Office Refurbishments Partitioning Suspended Ceilings

Complete Office Design and Refurbishment

Client: Thales Optronics
Value: £55k

Cre8tive Interiors were ask to look at the complete office design and refurbishment for Thales Optronics in Taunton, to convert an existing factory area into a new reception area. Initial work required the removal of a metal skinned demountable system, ceilings and lighting, along with stripping out and replacing the entrance doors with new glass doors.

The lighting chosen was LG3 direct / indirect fittings which is the recommend lighting systems for modern offices. The partitions included silicon jointed glass called Komfort Polar, joining into Komfort Kameo 75mm system which offers a soft radius profile and joins neatly with the Polar silicon jointed system. The doors are disable access width to conform to the DDA regulations.

Existing Space

Thales did not use this building and wanted to create more of a main reception for the site. The building inside was very factory looking, in that it had metal partitions. Fine for a laboratory environment, not very nice for offices. The lighting was also pretty bad with old lino, the whole area needed replacing.

Drawing and Design work

Construction work

Final Photographs

Design and Refurbishment Work

Often with these projects the hard part is knowing where to start. The customer knows it is not right and may have seen other areas that they like. Translating that into a cost can be quite difficult, so what we do at Cre8tive is to listen and then try and interpret what the customer wants. We go through certain steps and doing the drawing work is one of them.

If you are struggling to come up with something, please do not hesitate to give us a call 01380 73 88 44 or email us on [email protected]

Categories
All Project Categories Office Furniture

Be Spoke Reception Desk Manufactured and Installed in Bristol

Client: Bristol City Council
Value: £29k

Design and Drawing work

We had carried out several jobs in the past for Bristol City Council, and we were approached to re-fit the reception at their Customer Services Point at Waring House. The main feature of the area was to design, build and supply a new reception desk and to make the meeting rooms appear open with Demountable Partitions using glass.

Offsite and on site fabrication and assembly

The way to make this size of reception desk is to make it off site in the workshop and then assemble it on site.

Finished reception desk

The extent of our work finished at the final photo above. They were they going to carpet up the front face of the desk and top as they found that their customer wore this section of the desks out first. The carpet tiles could be replaced. They also finally decorated various parts of the desk as they wanted to do this, so that was reflected in the price. The overall effect was actually pretty impressive.

Special Projects

We can get pretty much anything made. This particular desk did have some design input from us as the Council took us to several other sites, in the end this was the Councils’ design and hey were very pleased with it.

If you need any reception desks or anything unusual made, please do not hesitate to contact us on 01380 73 88 44, or email us at [email protected]

Categories
All Project Categories Partitioning

Budget Conscious Low Cost Demountable Partitioning in Swindon

Client: APS Mortgages
Value: £5.9k

Drawing and layout work

We had already laid out the storage wall on this project on a separate design, at the same time we designed the layout for the offices and meeting rooms on the first floor.

Demountable partitioning was the obvious solution to the issues that the customer had. The requirement for this project was to provide low cost offices with a boardroom which would still look pleasant but not costing much money. The 50mm wide composite system still offers a degree of sound insulation and can still be made to look really nice with double glazed blinds, powder coated frames and veneered doors.

To improve the sound insulation between offices we used a 75mm wall in these positions only to keep costs down. Unfortunately this is one of the few project that we do not have any construction photographs for, just a couple of the finished room.

Demountable Partitions for meeting rooms

Why Demountable Partitioning?

  1. Demountable partitioning is tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts. Please click on this link for a bit more information.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Questions on Demountable Partitioning? ..

If you are not sure about anything we love to talk about projects and sort out problems and issues with space, please give us a call on 01380 738844

Categories
Air Conditioning All Project Categories Mezzanine Floors Mezzanine Floors Office Refurbishments Partitioning Suspended Ceilings

Office Refurbishment in Milton Keynes

Client: Edwards International
Value: £187k

Office Refurbishment

We were  invited by this customer to have a look at their existing office space as it needed an office refurbishment in Milton Keynes and the customer did not know where to start. They found us on the internet and liked our website as it showed real photos of actual projects rather than nice photo shopped images.

Out of the few that they contact we were the only ones to respond to their enquiry within a day.

When we first visited the client it was very obvious that the while area needed stripping out and starting again. What was surprising, although in reality we are not surprised, was that the existing partitions and mezzanine floor were not fire rated. We recognised the system below the mezzanine as a 50mm wide demountable partition system which has no fire rating at all. None of the exit routes out of the building were 30 minute protected and the mezzanine floor had a suspended ceiling fitted but it was not fire rated. The staff were working in a death trap. If there was any problem in the building then there would be a lot of trouble. The customer specialises in fire detection equipment, so for them to be in a building that was a potential death trap as it was not properly fire protected was nonsense.

Building Regulations

There were three different mezzanine floors installed at various times at different heights, and no paperwork to show that they had been passed Building Regulations, so from a fairly straightforward requirement to refurbish the offices there was a need to look at the whole building, design and specify it properly and get Building Regulation Approval. In the design we had to consider:

  • Fire protection of the mezzanine floors using the correct grade of suspended ceiling tile and support  column encasement
  • Correct design of protected fire exit routes throughout the building, checking of escape distances and signage
  • Full electrical design to suit.
  • New fire rated partitions where needed to meet Building Regulations
  • Supplementary fresh air systems to enclosed offices
  • Changes to air condition systems
  • Heating were needed.

CDM

There was no doubt that we were going to be on site for more than a month, and have more than 5 people on site, the whole project was quite a bit of work and so the work comes under the Construction Design and Management Regulations. The purpose of the regulations is to protect the employee and employer in making sure that a construction project is run safely. If you do not notify the Health and Safety Executive that the project is being carried out and there is a problem then directors of the company where the work is being done can go to jail.

Where do we start?

The first step is to measure everything and take lots of photos to see exactly what has been fitted. The next was to understand from the customer how they wanted to work in the space, so this included some basic functional block drawings identifying where they wanted Sales, Accounts and Technical. Once the broad locations were identified then the detail layouts were carried out identifying voice and data positions, partitioning and ceiling layouts and the work that had to be done on the mezzanine floor. Once the layouts were agreed we had to submit the plans to Building Control and get their approval which we did.

We produced many many drawings. All showing everything that was needed for each trade. Some shown below. The important document was the Building Regulations Approval document that is a legal requirement.

Existing Photographs

The first two photographs below show the immediate and obvious problem. The partitions are 50mm wide demountable and are not fire rated at all. The third photo shows the the vast storage area out the back. The rest just show the general bland and dated look of everywhere needed some tlc.

Stripping out and Construction work

We produced a plan and submitted all of the documents to the local Building Control people who assessed the drawings and arranged for some visits throughout the work. We also employed a Health and Safety Consultant who oversaw the work and kept all of the sub contractors on their toes, and they submitted the F10 to the Health and Safety Executive.

Refurbishment Projects

Categories
All Project Categories Consult Install Office Refurbishments Partitioning

Office Fit Out British Nuclear Group in Bridgewater

Client: British Nuclear Group
Value: £99k

Cre8tive were contacted by an Office Furniture company as they were not able to deal with the office fit out side of the project for British Nuclear Group. The customer had already employed an architect to specify what was required and so it was really a case of demonstrating that we knew what we were doing and that could cost the project to meet the clients budget. This project took place on the ground floor of Mallard Court.

The project was designed by Oxford Architects who specified the partition system.

The project was a 6 week duration project which had to run under the Construction Design and Management regulations. Cre8tive Interiors acted as Principle Contractor on the project. The office fit out  for British Nuclear Group consisted of Komfort Double Glazed Polar Demountable Partition System, as well as single glazed Polar screens and Komfort Komfire 100 partitions. The project also included supplying and fitting of a kitchen from Howdens, new carpets, fitting of fire barriers in the ceiling and floor voids, and complete decoration of the workspace.

Initial design and drawing work

Initial site photographs before work

Construction Photographs

Working for the British Nuclear Group had it’s challenges. As you would expect every aspect of the work was scrutinized, we also had to have a permanent person on site all of the time which sometimes on projects like this we do not always need to have fitters doing work whilst other work is being done by others. BNG contracted their own duct work people, so they had to carry out some works when we had to be off site.

Completed Photographs

Why Demountable Partitioning?

This particular project had what we call demountable partitioning in it. Landlords insist on this type as it can be easily relocated without doing much damage to the building.

  1. Demountable partitioning is tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Need an Office Fitting out?

This particular project was driven by BNG with a design carried out by Oxford Architects. We were the contractor who completed the work. If you need any design work doing we can do this, as well as being the principle contractor for the work.

Any questions please do not hesitate to contact us on 01380 73 88 44 or email [email protected]

Categories
All Project Categories Partitioning

Building an Office Partition on a Reception Desk

Client: Malmesbury Primary School
Value: £5.6k

This was a difficult problem to solve and the only way we could think of doing this was to actually construct a glass partition onto the reception desk. The school had a specific issue with noise coming into the office area as the reception desk is in a main traffic area. Draught’s were also a problem as well as some of the electrical control equipment including the CCTV system was spread over a large area. A new cabinet was supplied under the desk with all the cables re-routed to suit. It was also important to keep the costs to minimum so various options were considered before work started.

In addition to the above, the school wanted some degree of sound insulation. Their initial thought was that the desk would have to be rebuilt with some form of new partition built and all of the computing equipment behind the desk would have to be moved. The CCTV and security systems would also have to be disconnected so a real nuisance. I did think that the desk that was there was pretty good and we could keep it in place, why get rid of it. The idea then was to build something on top of it. The complicated section was on the raised section, a normal partition system would have very chunky frames, so we chose a silicon jointed glass system that would be ready neat and tidy. The joins of the glass could then be angled and ground, then seal with a silicon seal without any vertical aluminum uprights that you would normally use on a conventional partition system.

A further requirement was that they wanted a sliding hatch arrangement so they could open and shut glass doors as needed and we could build this in a partition.

Construction photos

Timing was important as with a busy school and the reception desk being situated in the main thoroughfare, we had to build the partitions out of school hours for safety. The first section to build was the more conventional sliding frame hatch using a conventional partition system but using special ‘Chas mood’ sliding door gear within the partition frames. Once the sliding hatch was built, the glazed system was constructed across the desk. Once all of the frames were built the glaziers arrived to fit the glass.

Completed photos

We did use two different proprietary demountable partitioning systems to provide the finish result. There are several good reasons to use this type of system, the main one is that it can be taken down and removed quite easily. The words demountable partitioning are used quite often in our fit out and refurbishment projects.

Summary on Demountable Partitioning

  1. Using Demountable Partitioning is very tax efficient as they are seen as movable items and so can be treated differently in writing down allowances in the accounts. We have a better description on our News / Blog page on this site.
  2. We can also lease Demountable Partitioning as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of demountable partitioning is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on Demountable Partitions being used for offices as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall.

Questions on extending offices?

If you are not sure about anything as well as taking about all kinds of partitioning including Demountable we love to talk about projects and sort out problems and issues with space, please give us a call on 01380 738844

Categories
All Project Categories Partitioning Suspended Ceilings

Office Fitting in Melksham on a Mezzanine Floor

Client: Coombe Castle
Value: £62k

Cre8tive was asked to help carry out an office fitting project for Coombe Castle,who were moving from Corsham to Melksham. The work on this started 6 months ago, once the customer had in mind what they wanted to do, Cre8tive carried out a detailed plan of the building. This involved taking accurate measurements of all of the inside and outside space, in particular determining where all of the cabling went.

Cre8tive then designed the position of the new canteen and offices that were required on the existing mezzanine floor. The only problem was that the roof height was over 4 meters high, and Building Regulations says that you have to have 1 hour fire separation between offices and warehouse, so we devised a specification to meet this.

Other requirements for office fitting included spaces that need ventilation and heating, so Cre8tive had to extended the existing heating system, and fit a VAM  unit within the ceiling void to take air from the outside to the inside.

The office fitting project included data cabling the existing offices as well as the new, providing all electrical, flooring, kitchen, decorations and suspended ceiling for the space.

Drawing and specification work.

We produced many drawings for each of the areas that we had to work on. This included work to the front offices, so they needed power and data, lighting, repairs to the suspended ceiling and new carpet. Other areas included:

  1. Repairing some of the panels in the toilets.
  2. Stripping out the existing kitchen and canteen, converting into a new Sales office.
  3. Providing all of the plumbing requirements for the clean room area downstairs.
  4. Building new offices and canteen on top of the mezzanine floor which had to meet building regulations.
  5. New heating and ventilation.
  6. New comms rack.
  7. Painting much of the outside block walls white.
  8. Building a couple of offices on the shop floor, again these had to be 1 hour fire rated.

Existing building photos before work

Construction photos

Completion photographs

Project Management..

We have many ideas on how to make the best use of space, and we are seeing offices and talking to customers all of the time. Over the years we have seen many projects and often have to work to a budget. What we do is get the space working right first and then focus on the budget. In this case the budget was very tight so we ended up using a very cheap carpet which did not affect the design of the office, and just brought it into the manageable level for the customer. This project was leased over 3 years. Please contact us for further information about leasing and financing.

01380 73 88 44 or email us at [email protected]

Categories
All Project Categories Partitioning Projects Storage Walls

Storage Wall and Demountable Partitions

Client: Cole Easdon Consultants Swindon
Value: £10k

Storage wall with demountable partitions

Cole Easdon approached us with a couple of requirements for their new office in Swindon. The first was to construct a couple of office but they also had a major problem with storage. We realised that we could utilise the full height of the ceiling and use a product called storage wall, which is a full height cupboard constructed and fitted to the underside of the suspended ceiling which acts like a partition. We then built some demountable partitions off the storage wall to solve the problem.

Storage Wall Project photographs

Why Demountable Partitions in Office Refurbishments?

  1. Demountable partitions are tax efficient in that they are seen as movable items and so can be treated differently in writing down allowances in the accounts, we can also lease elements of office refurbishments. Anything that can be moved.
  2. We mainly lease Demountable Partitions as they are movable, this spreads the costs of having the work done as Demountable Partitions always cost more than customers think.
  3. Leasing of movable items is very tax efficient and Cre8tive can provide illustrations, please contact us for further information.
  4. Most landlords insist on demountable partitions in an office as it is much easier to take them out should the tenant renting the space leave for any reason. The benefit is that is saves making a huge amount of mess and destruction that would be need with a conventional stud and plasterboard constructed wall

Storage wall or Partitioning questions?

We have been supplying and fitting storage wall and demountable partitioning as part of our main refurbishment projects for over 15 years, if you are unsure about anything please give us a call.

Please give us a call on 01380 73 88 44.